13.07.2015 Views

Installation Instructions - Clipsal

Installation Instructions - Clipsal

Installation Instructions - Clipsal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Intelligent Building SeriesC-Bus 12 Channel Professional Architectural Dimmer <strong>Installation</strong> <strong>Instructions</strong>For each channel there is provided an Active, Neutral and Earth terminal. Thisterminal block can accommodate load wiring of 4.0mm 2 wire or 2 x 2.5mm 2wire.WARNING1. Do not wire dimmer channels in parallel.2. Load terminals are not isolated when the output is in the OFF state.3. A maximum of 80 C-Bus 12 Channel Professional Architectural Dimmerscan be connected to a single network.4. Do not short dimmer channel output to neutral or earth.© Copyright 2003 <strong>Clipsal</strong> Integrated Systems Pty Ltd. Page 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!