13.07.2015 Views

Installation Instructions - Clipsal

Installation Instructions - Clipsal

Installation Instructions - Clipsal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Intelligent Building Series C-Bus 12 Channel Professional Architectural Dimmer <strong>Installation</strong> <strong>Instructions</strong>Cat No L5112D10B2 L5112D12B2 L5112D16B2 L5112D10BN2 L5112D12BN2 L5112D16BN2 L5112D10B2S L5112D10B2NSRemote InputsOpen-state Voltage(On/Off Input)5VMaximum cable length C-Bus – 1000m, Alternative wire on 4-way connector – 1mRemote Input to C-BusIsolation VoltageNot isolatedRemote Override Input 2 x RJ-45 connectors, 1 x 4-way removable terminal blockStatus IndicatorsC-Bus Status Clock Present No Clock PresentVoltage ≥ 20V DC On OffVoltage < 20V DC Flashing OffVoltage < 15V DC Off OffUnit Status C-Bus Power ConditionsOn Present Normal OperationFlashing Present At least one channel in local or remote override modeOff Fail C-Bus not availableLoad Indicators (1 – 12)Load indicator is On (Amber) when dimmer output is On at any C-Bus determined dimming levelLoad indicator is On (Green) when dimmer output is On at any DMX determined dimming levelMechanicalMains Supply Terminals Accommodates 1 x 6.0mm 2Load Terminals Accommodates 1 x 4.0mm 2 or 2 x 2.5mm 2Dimensions 533 x 486 x 163mmWeight 21kg© Copyright 2003 <strong>Clipsal</strong> Integrated Systems Pty Ltd. Page 32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!