13.07.2015 Views

SPR-696: Preliminary Study of Climate Adaptation for the Statewide ...

SPR-696: Preliminary Study of Climate Adaptation for the Statewide ...

SPR-696: Preliminary Study of Climate Adaptation for the Statewide ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

21Table 3. Matrix <strong>of</strong> <strong>Climate</strong> Impacts, Responses, and Potential ADOT Departmental Responsibility (continued)Potential Infrastructure ImpactIncreases in wea<strong>the</strong>r-relateddelays and traffic disruptions(NRC, 2008)Responses (Operational, Design-Related, or O<strong>the</strong>r)ADOT Technical StaffResponsibility Improve drainage ITD – Roadway Engineering Group Upgrade road drainage systems ITD – Roadway Engineering Group Improve flood protection ITD – Environmental PlanningGroup Improve asphalt/concrete mixtures ITD – Engineering TechnicalGroup, Materials Group Increase culvert capacity ITD – Roadway Engineering Group Conduct risk assessment <strong>for</strong> new roads ASD – Safety & Risk Management Per<strong>for</strong>m adequate maintenance ITD – Maintenance, RoadwayEngineering Group, EnvironmentalPlanning Group Increase pumping capacity <strong>for</strong> tunnels ITD – Roadway Engineering GroupConduct emergency contingency planning(CCSP, 2008)ITD – Maintenance (EmergencyPreparedness Team) Minimize repair backlogs (CCSP, 2008) ITD – Maintenance Group Increase <strong>the</strong> standard <strong>for</strong> drainage capacity <strong>for</strong>new transportation infrastructure and majorrehabilitation projects (NRC, 2008)ITD – Roadway Engineering GroupIncrease use <strong>of</strong> sensors <strong>for</strong> monitoring waterflowsITD – Roadway EngineeringGroup, Environmental PlanningGroupConduct more real-time monitoring <strong>of</strong> flood levels ITD – Environmental PlanningGroup Restrict development in floodplains (NRC, 2008) ITD – Environmental PlanningGroupIntegrate emergency evacuation procedures intooperations (NRC, 2008)Maintain effective traffic operations andcommunications systemsITD – Maintenance (EmergencyPreparedness Team)ITD – Operations, TransportationTechnology Group, ValleyTransportation, PhoenixMaintenance District, DistrictsASG – Grand Canyon AirportADOT Cross-CuttingDepartment ResponsibilityITDADOT ManagementResponsibility

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!