13.07.2015 Views

SPR-696: Preliminary Study of Climate Adaptation for the Statewide ...

SPR-696: Preliminary Study of Climate Adaptation for the Statewide ...

SPR-696: Preliminary Study of Climate Adaptation for the Statewide ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

and how <strong>the</strong>y apply <strong>the</strong> money <strong>for</strong> use (<strong>for</strong> instance, <strong>the</strong>ir budget requests may beas short as two pages, with no backup). Figuring out what is spent is a challengein and <strong>of</strong> itself.o Routine maintenance is still deferred by <strong>the</strong> districts; and although maintenancecrews had intended to do <strong>the</strong>se tasks, <strong>the</strong> work <strong>of</strong>ten is sidelined due toemergency response needs. Emergency response funding is usually moreattractive <strong>for</strong> legislators.o Once costs are isolated, <strong>the</strong>re is still a lot <strong>of</strong> guesswork. Each maintenance districtmanages its own funding. ADOT has a decentralized system, and <strong>the</strong>re is littleresource sharing at <strong>the</strong> district level.o PEr<strong>for</strong>mance COntrolled System (PeCoS) is <strong>the</strong> maintenance databasemanagement system. There are many issues. Right now, it collects a lot <strong>of</strong>in<strong>for</strong>mation, but one typically needs Structured Query Language (SQL) datacoding to extract <strong>the</strong> data. It keeps track <strong>of</strong> use (data and equipment), but does notreally help with needs.o For instance, <strong>the</strong> database records <strong>the</strong> cubic yards <strong>of</strong> mix used, but does not saywhe<strong>the</strong>r it is used to fill 20 small potholes or one large pothole. It is hard to getfeedback on <strong>the</strong> activities (<strong>for</strong> instance, Globe might need a certain type <strong>of</strong>snowplow <strong>for</strong> its hilly terrain whereas Holbrook needs plows <strong>for</strong> a flatter terrain).o It is particularly important to collect data from field managers, and to aim <strong>for</strong>usability <strong>of</strong> <strong>the</strong> project.Correlating Extreme Wea<strong>the</strong>r Trends with Maintenance Budgetso The budget <strong>of</strong>fice is trying to correlate extreme wea<strong>the</strong>r trends with <strong>the</strong> futureneeds <strong>of</strong> <strong>the</strong> maintenance organizations. Each maintenance organization has adifferent need based on its own geography and roadway characteristics.o One ef<strong>for</strong>t <strong>of</strong> interest will be to categorize vehicle accidents according to whe<strong>the</strong>r<strong>the</strong>y are “typical” accidents or wea<strong>the</strong>r-related incidents. There are costsassociated with wea<strong>the</strong>r events; upon initial assessment <strong>of</strong> data (from at least sixyears prior), <strong>the</strong> peaks are much greater than <strong>the</strong> troughs. The budget <strong>of</strong>fice isworking with <strong>the</strong> risk management <strong>of</strong>fice to deal with <strong>the</strong> risks <strong>of</strong> naturaldisasters. There can be “reserves” built in, depending on <strong>the</strong> funding system, if <strong>the</strong>district or department is so lucky to have additional resources that are not depletedby <strong>the</strong> end <strong>of</strong> <strong>the</strong> year.GIS and Spatial Mapping Capabilitieso The budget <strong>of</strong>fice is working with <strong>the</strong> GIS department to develop district pr<strong>of</strong>ilesand a spatial mapping environment <strong>for</strong> analysis. This will enable <strong>the</strong> visualization<strong>of</strong> equipment and road needs with existing wea<strong>the</strong>r trends, such as snowfallin<strong>for</strong>mation.o Currently, this data is focused on past trends, although <strong>the</strong>re may be interest inconsidering future climate projections. The technical side <strong>of</strong> spatial mapping isstraight<strong>for</strong>ward, but <strong>the</strong>re may be barriers at <strong>the</strong> leadership level when integratingclimate change into <strong>the</strong> model. For example, ADOT would have to agree on astatewide projection or future climate scenario (and an ADOT-approvedprojection is unlikely to happen without state guidance).o Currently, ADOT’s budget analysis can only change <strong>the</strong> confidence level <strong>for</strong>future climate projections (from an actuarial point <strong>of</strong> view). For instance, <strong>the</strong> risk46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!