13.07.2015 Views

FINAL SITE INSPECTION REPORT

FINAL SITE INSPECTION REPORT

FINAL SITE INSPECTION REPORT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

220221222223224225226227228229230231232233234235236Fiscal Year 2002 for the DoD to assign a relative priority for munitions responses to eachlocation in the DoD inventory of defense sites known or suspected of containing UXO, discardedmilitary munitions, or MC (70 FR 58016).The MRSPP uses three modules to evaluate the hazards on these sites. The modules include the:1. Explosive Hazard Evaluation (EHE) module, that evaluates relative risks of explosivehazards;2. Chemical Warfare Material Hazard Evaluation (CHE) module, that evaluates hazardsrelated to the physiological effects of chemical warfare material; and3. Health Hazard Evaluation (HHE) module, that evaluates relative risk to human healthand the environment from MC and any incidental non-munitions related contaminants.A munitions response site (MRS) receives a separate numerical score and priority ranking undereach module. There are three alternative scoring outcomes for each module, including: 1)Evaluation Pending; 2) No Longer Required (e.g. a response action was already taken); and3) No Known or Suspected Hazard. Ultimately, the MRS is assigned one site-wide priorityderived from the module specific scores and priorities.Draft MRSPP scoring sheets for the MRSs identified in this SI Report are included in AppendixK. The MRSPP scoring will be updated on an annual basis to incorporate new information.Boardman AFR Final SI Report.doc 1-4 Contract No. W912DY-04-D-0010 Delivery Order No. 003September 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!