13.07.2015 Views

FINAL SITE INSPECTION REPORT

FINAL SITE INSPECTION REPORT

FINAL SITE INSPECTION REPORT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1932193319341935193619371938193919401941194219431944194519461947194819491950195119521953195419551956195719581959196019611962196319641965196619671968196919701971Los Alamos National Laboratory (LANL), 2005, Environmental Restoration (ER) ProjectEcorisk Database (Release 2.2), September. Copies of the LANL data base can be obtained bycontacting Patricia G. Newell, Toxicologist/ Database Manager, Environmental HealthAssociates, Inc. pgnewell@cybermesa.com; Rich Mirenda, LANL rmirenda@lanl.gov; or AlisonDorries, LANL, adorries@lanl.gov.Myers, Jonathan and Karen Thorbjornsen. 2004. Identifying Metal Contamination in Soil: AGeochemical Approach, in Soil and Sediment Contamination. Vol. 12, pp 1-16.Nelson, Leslie. 2006. Email from M. Nelson (USACE) to D. Landon (Shaw). BoardmanDemolition Shape File. July 21, 2006.Oregon Department of Environmental Quality (ODEQ). 1995. Hydrogeology, GroundwaterChemistry, and Land Use in the Lower Umatilla Basin Groundwater Management Area. FinalReview Draft. 1995.Oregon Department of Environmental Quality (ODEQ). 2001. Screening Level Values. December2001.Oregon Department of Environmental Quality (ODEQ). 2005. Perchlorate in the Lower UmatillaBasin Groundwater Management Area – Issues and Answers. June 2005.Oregon Parks and Recreation Department (OPRD). 2006. Letter from Dennis Griffin (OPRDHeritage Conservation Division) to Lisa Stahl (Shaw). Re: SHPO Case No. 06-2401, MilitaryMunitions Response Program Projects, Boardman AFR and Central Oregon Gunnery Range.October 13, 2006.Oregon Department of Fish and Wildlife (ODFW). 2007. Telephone call from Dale Landon (Shaw)to Russ Morgan (ODFW). Re: T & E Species at Boardman AFR. January 7, 2007.Pacific Northwest National Laboratory (PNNL). 2005. Visual Sampling Plan.http://dqo.pnl.gov/vsp/. Prepared for the U.S. Department of Energy. July 2005.Severn Trent Laboratories (STL). 2003. Standard Operating Procedure – SW-846 Method 8321-modified, Determination of Perchlorate by Liquid Chromatography/Mass Spectrometry.Shaw Environmental, Inc. (Shaw). 2006a. Final Type I Work Plan, Site Inspections at MultipleSites, NWO Region, Formerly Used Defense Sites, Military Munitions Response Program. Preparedfor U.S. Army Corps of Engineers. February 2006.Shaw Environmental, Inc. (Shaw). 2006b. Final Technical Project Planning Memorandum,Boardman Air Force Range, FUDS ID F10OR0160. Prepared for U.S. Army Corps of Engineers.November 27, 2006.Shaw Environmental, Inc. (Shaw). 2007. Final Site-Specific Work Plan, Boardman Air ForceRange, FUDS ID F10OR0160. Prepared for U.S. Army Corps of Engineers. February 8, 2007.U.S. Army Corps of Engineers (USACE). 1992. Boardman Air Force Range Inventory ProjectReport. September 1992.U.S. Army Corps of Engineers (USACE). 1997. Archives Search Report, Findings, FormerBoardman Air Force Range, Boardman, Oregon. August 1997.U.S. Army Corps of Engineers (USACE). 2003. Explosives Safety Submission, Engineer Pamphlet385-1-95b.Boardman AFR Final SI Report.doc 12-2 Contract No. W912DY-04-D-0010 Delivery Order No. 003September 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!