13.07.2015 Views

2011_AAPA_Study_Tour.. - Aapaq.org

2011_AAPA_Study_Tour.. - Aapaq.org

2011_AAPA_Study_Tour.. - Aapaq.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7. Sustainability - Questions & Responses <strong>AAPA</strong> <strong>2011</strong> <strong>Study</strong> <strong>Tour</strong> Group ReportThe introduction of Warm Mix Asphalt Technologies using foamed bitumen, <strong>org</strong>anic waxes,surfactants & zeolites and has seen the inclusion of higher percentages of RA in all layers due tothe less hardening of the bitumen with the lower mixing temperatures and improved coatingachieved. This has particular relevance to wearing courses.For cold in-place and cold in-plant recycling 100% of the existing material is reused with theaddition of foamed bitumen or bitumen emulsion. Whilst not currently used in South Africaanymore, hot in-place recycling makes use of only small additions of virgin aggregate resulting invery high percentages of RA in the final pavement.Q 3. Are their restrictions on the use of modified binders in RAP? Are their restrictions on theuse of RAP in modified binder mixes?RA from asphalt including EVA and SBS modified binders is permitted and is not considered aproblem for recycling. Additional care is recommended in the preliminary mix design stage whenusing this RA in excess of 30%. RA that is derived from bitumen rubber modified asphalt should betreated with extra caution where the RA content exceeds 15%.There is no guidance given or specific exclusion in the use of RA in modified binder mixes. Indiscussion with South African practitioners less that 15% RA is added to modified asphalt mixeswhich continue to achieve the mix design criteria.Q 13. How do they manage RAP from milling of the City &Urban projects? Is SANRAL or Sabita(members) responsible for transport, storage and processing of RAP?The ownership of RA varies by project and jurisdiction. Typically the RA is preserved for use by theroad authority and then made available for inclusion in given projects. The evaluation andsubsequent processing of the RA is undertaken as part of the project development and execution.The Sabita hot mix asphalt producers collect and process RA for incorporation into normal asphaltoperations as percentages varying from 5 to 15%.Recycling and in-plant foam stabilization – eThekwini / Durban MunicipalityIn the example of the eThekwini / Durban municipality the RA (and other reusable constructionmaterial) is planned and managed from project inception to material usage, with the pavementmanagement system used to monitor and manage the value / status of the materials. The councilV4-2 Page 99

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!