13.07.2015 Views

IDN Document - ICT

IDN Document - ICT

IDN Document - ICT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project <strong>Document</strong>ation must include each of the following: Typical access controlled door wiring diagram to demonstrate standards 4.2.1,4.2.6, 4.2.7, 4.2.8 and 4.2.9.This diagram should include control equipment termination, field device termination,including lock, reed switch, reader(s), REX and emergency door release. Cabletype(s) should be indicated, and conductor colors should be labeled. Power supply loading calculations to demonstrate standard 4.3.5. Voltage drop calculations to demonstrate standard 4.2.9. Cable Schedule to demonstrate standards 4.1.3, 4.1.4 and 4.4.1.d. Site Plan to demonstrate standards 4.4.1.b and 4.4.1.c. Hardware Schedule to demonstrate standard 4.4.1.e. End user system operating manual to demonstrate standards 4.4.2.24 <strong>IDN</strong> <strong>ICT</strong> Dealer Network Terms and Conditions | January 2014

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!