13.07.2015 Views

Basic Assessment Report - SRK

Basic Assessment Report - SRK

Basic Assessment Report - SRK

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Basic</strong> <strong>Assessment</strong> <strong>Report</strong>Planning StatusPlanning status was ranked according to conformance with planning requirements for the area (Dube TradePort Development Framework Plan (DTPDFP),Extract from the Umhlanga Town Planning Scheme No. 1: Table D, Special Zone 10 (airport) and Undetermined and the Dube TradePort Airport Precinct 1(South Eastern Sub-precinct) Development Manual), with sites with greatest conformity being given a ranking of 10 and sites with limited conformity beinggiven a ranking of 0. The site planning informants contained in the DTPDFP were examined. The sites least affected by these constraints include: E1, E2, C1,C2, D1 and D2. The sites most affected include A1 and A2; these sites also fall within an area designated for rehabilitation in the Environmental ServicesFramework. Sites B1 and B2 fall on the edge of this area within a small pocket area in a support zone. However due to the proximity of these sites to therehabilitation area and close proximity to drainage lines/ streams they have scored a slightly lower ranking status.Land OwnershipThe land ownership of sites has been provided for information purposes.Traffic Related CriteriaThe ranking for this section was taken from Aurecon’s placing of the sites from best to worst, with best being given a ranking of 10 and worst a ranking of 0.Site E1 (ACSA’s preferred site) was found to be the best site for a PFS, followed by E2 (ACSA’s alternative site), then C1 and then C2. It shouldhowever be noted that sites C1 and C2 are very close in proximity to the Dube Boulevard / King Shaka Avenue interchange , at which major futuretraffic development changes are planned. Sites A1 and A2 were rated as the worst sites for a PFS.Department of Agriculture,Environmental Affairs & RuralDevelopment, KwaZulu-Natal<strong>Basic</strong> <strong>Assessment</strong> <strong>Report</strong> 2010Version 2: August 2010Page 17 of 46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!