13.07.2015 Views

Automotive Refinishing Policy Manual - Sacramento Metropolitan Air ...

Automotive Refinishing Policy Manual - Sacramento Metropolitan Air ...

Automotive Refinishing Policy Manual - Sacramento Metropolitan Air ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

777 12 TH STREET, 3 RD FLOOR SACRAMENTO METROPOLITANAIR QUALITYMANAGEMENT DISTRICTSACRAMENTO, CA 95814AUTHORITY TO CONSTRUCT(CONTINUED)23. Paint spray gun cleaning must be done so that an atomized mist or spray of the cleaning solvent is notcreated outside a container that collects used gun cleaning solvent.[Basis: 40 CFR 63 Subpart HHHHHH, Section 63.11173(e)4]MANAGEMENT PRACTICES/TRAINING24. Each painter must undergo training that includes, but not limited to: painting techniques to minimize paintoverspray and equipment maintenance. Initial painter training will be valid for five years and a refreshercourse will be required once every five years.[Basis: 40 CFR 63 Subpart HHHHHH, Section 63.11173(f)2(i) – 63.1173(f)2(iv)]25. All painters must complete training no later than 180 days after being hired or January 10, 2011,whichever is later.[Basis: 40 CFR 63 Subpart HHHHHH, Section 63.11173(g)2]RECORDKEEPING26. The following records shall be maintained on-site and shall be made available for review by the U.S. EPAor the <strong>Air</strong> Pollution Control Officer upon request:A. Records of notifications submitted to the U.S. EPAB. Painter training certificationsC. Documentation of spray both filter efficiencyD. Documentation of spray gun transfer efficiencyE. Any relevant documentation on deviations and corrective actionsAdditional Recordkeeping Requirements for Paint Stripping Operations Using MethyleneChloride:F. Each paint stripping operation must maintain copies of annual usage of paint strippers containingMeCl on site at all times (tons/year).G. Each paint stripping operation with annual usage of more than one ton of MeCl must maintain acopy of their current MeCl minimization plan on site at all times.[Basis: 40 CFR 63 Subpart HHHHHH, Section 63.11173(a) – 63.11177(g)]MANAGEMENT PRACTICES FOR STRIPPING OPERATIONS27. Each paint stripping operation that is an affected area source must implement management practices tominimize the evaporative emissions of MeCl. The management practices must address, at a minimum,the practices listed below, as applicable, for your operations:A. Evaluate each application to ensure there is a need for paint stripping (e.g., Evaluate whether it ispossible to re-coat the piece without removing the existing coating).B. Evaluate each application where a paint stripper containing MeCl is used to ensure that there is noalternative paint stripping technology that can be used.C. Reduce exposure of all paint strippers containing MeCl to the air.PAGE 8 of 10THIS IS NOT A PERMIT TO OPERATEA/C NO.:XXXXX

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!