13.07.2015 Views

RESERVOIR SEDIMENTATION ASSESSMENT GUIDELINE - Aneel

RESERVOIR SEDIMENTATION ASSESSMENT GUIDELINE - Aneel

RESERVOIR SEDIMENTATION ASSESSMENT GUIDELINE - Aneel

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Reservoir Sedimentation Assessment GuidelineFigure 11.3 – Location in depth points measured along a cross-section with teodolitesPosição = positionReservatório = reservoirPosição do barco no instante de observação com o teodolito = position of boat during observation with teodoliteMarcos de levantamento nas extremidades da linha = survey marks on the line endsMargem = bankPosição do teodolito = tedolite positionFigure 11.4 – Schedule for survey operation through electronic system(Bruk, 1985)Estação remota de resposta = response remote stationTransmissor = transmitterAntena = antennaEquipamento de controle = control equipmentRelógio = clockEcobatímetro = echobathymeterIndicador de rota = routerGravador = recorderRegistrador de rota = route registerSinal de sonda de profundidade = probe signalANEEL – Brazilian Electricity Regulatory Agency / SIH – Hydrologic Studies and Information Department58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!