30.07.2015 Views

1 Milltown Park Subdivision Replat CITY ... - City of Sandpoint

1 Milltown Park Subdivision Replat CITY ... - City of Sandpoint

1 Milltown Park Subdivision Replat CITY ... - City of Sandpoint

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ights-<strong>of</strong>-way within the subdivision. The PlanningCommission has recommended that improvements to BoyerAvenue be triggered by development on adjoining lots.As noted, the plat indicates two future access easements.The Public Works Director is requiring that all new rights<strong>of</strong>-waywithin the subdivision be constructed in accordancewith <strong>City</strong> standards, including curb, gutter, and sidewalk.<strong>Sandpoint</strong> <strong>City</strong> Code 10-1-3.A requires that a developerinstall all street, sidewalk, water, and sewer improvementbefore final plat approval, or enter into an agreement fortheir installation, with the installation to occur no later than 3years from the date <strong>of</strong> final plat approval. TheCommission’s recommendation includes a condition that theinternal road be platted as a complete street with thissubdivision but did not require its improvement.The Public Works Director also noted a 10-foot widebikepath between Larch Street and Boyer Avenue (north <strong>of</strong>Chestnut) is to be dedicated and constructed through thesubdivision. This is in keeping with one <strong>of</strong> the requirements<strong>of</strong> the short plat development agreement. The PlanningCommission’s recommendation includes a requirement forthe platting <strong>of</strong> a dedicated 10 foot wide bike path along theproperty perimeterThe Fire and Police Chief have both indicated a northernaccess and egress point is needed for this development. ThePolice Chief has indicated he agrees with the widening <strong>of</strong>Boyer Avenue and has also recommended the access road tothe east <strong>of</strong> Lot 1 be continued through Lots 4, 5 and 6 toconnect with Chestnut Street. At the Planning Commissionhearing, the Fire Chief noted it is important to have morethan one point <strong>of</strong> access in a development, but the plat meetsFire Code as proposed. The Planning Commission did notinclude a requirement for additional access in theirrecommendation.Neighborhood <strong>Park</strong>land:Stormwater Management:Infrastructure:N/AA stormwater management plan meeting the requirements<strong>of</strong> the <strong>Sandpoint</strong> Stormwater Ordinance will be requiredprior to final plat approval.According to the Public Works Director, existing watermains are located in Boyer Avenue and in the utilityeasement formally known as Maple Avenue. New mains to9 <strong>Milltown</strong> <strong>Park</strong> <strong>Subdivision</strong> <strong>Replat</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!