20.08.2015 Views

CODE OF PRACTICE FOR SUBDIVISION AND DEVELOPMENT

code of practice for subdivision and development - Waikato District ...

code of practice for subdivision and development - Waikato District ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Part 3 - Roads3.3.9 Crossfall on Grass BermsThe shape, slope and vegetation of berms shall be such as to provide satisfactorily forstorm water runoff, maintenance, location of services and vehicle crossings toproperties (unless acceptable alternative parking is provided). To achieve satisfactorydrainage the crossfall should be at least 3%.Grassed areas for tree planting which are additional to the minimum berm width shallbe specifically designed, in these areas steeper gradients may be permitted to amaximum of 20% providing the area can be mown or otherwise maintained by Council.3.3.10 Road PavementDesign LifeThe pavement shall have a design life of not less than 25 years. The following types ofpavement may be used within Franklin District:Flexible PavementAll flexible pavements shall be designed in accordance with the Austroads PavementDesign Guide and the New Zealand Transport Agency Supplement. The designershall produce a ‘Pavement Design Report’ which shall include:• Results of soils investigations• Design assumptions and figures• QA measures and recommendations for construction.Rigid PavementAll rigid pavements shall be designed as prescribed in the Austroads Pavement DesignGuide (Pavement Design – A Guide to the Structural Design of Road Pavements) andthe New Zealand Supplement, 1995.Pavement UnitsWith adequate support solid masonry paving units may be accepted in normal roadwaysituations and may also be a suitable alternative in light duty areas such as shoppingmalls and courtyards, where surface appearance is a consideration. For designinformation refer NZS 3116.Masonry units so designed as to enable grass to grow through the surface will not beaccepted for berm parking on road reserve.CBR TestsCBR values shall be determined in the laboratory according to test 18 of NZS 4402:Part 2P. Samples should be manufactured in the laboratory to a dry density equal tothat in the field. The CBR values used in the pavement design shall be soaked valuesunless otherwise approved by the Engineer. Other values may be submitted forapproval with sufficient evidence with reference to equilibrium moisture content toshow that the value chosen should be the minimum strength value likely to beachieved by the subgrade material over the life of the pavement.The CBR value used in the design shall be the 10-percentile value of the CBR teststaken on the subgrade material. The subgrade is the top 1m of material, eitheroccurring naturally on the site or imported, on which the pavement is constructed.Code of Practice for Subdivision and Development – Edition 5 October 2010 Page 44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!