Final RFP - IT Hardware for e-Secretariat & other Projects<br />
DoIT&C, Govt. <strong>of</strong> <strong>Rajasthan</strong>”, media, manuals and OEM support, updates, patches,<br />
and errata for the entire project period i.e. 5 years after successful commissioning.<br />
f) The supplied anti-virus clients should be installed on all the supplied desktop/ laptop/<br />
workstation computers.<br />
g) DoIT&C, upon receipt <strong>of</strong> delivery <strong>of</strong> all the ordered items as per prescribed timeschedule<br />
(lot-wise), shall verify the same in accordance with the delivery challan and<br />
thereafter inspect all the supplied items (upto 10% <strong>of</strong> each item type on a random<br />
sample basis) during the respective delivery to validate them in compliance with the<br />
work order.<br />
h) SI, after successful inspection (lot-wise) <strong>of</strong> supplied items by DoIT&C, shall carry from<br />
DoIT&C stores & install all the supplied items at designated project locations at his own<br />
cost. The SI shall install and configure the all the supplied licensed s<strong>of</strong>tware on<br />
respective hardware. Also, the SI shall integrate all the peripheral devices like printer,<br />
scanner, bar-code reader, etc. with Dekstop/ Laptop computer etc.<br />
i) The SI, wherever required & applicable, shall connect the supplied items to the existing<br />
SecLAN-MAN/ NIC network such that the end-user is able to access the SDC/ NIC<br />
infrastructure/ services <strong>of</strong> SecLAN-MAN/ NIC Network. This would require the SI to<br />
configure a given IP address on the installed equipment (Desktop, Laptop, Printer,<br />
Switch, etc.) as per SecLAN-MAN/ NIC IP addressing policy.<br />
j) All the equipment installed should bear a printed sticker tag consisting <strong>of</strong> SI Name,<br />
Helpdesk number, email address and URL which shall be referred to by the end-users<br />
for reporting any problem/ fault in the installed hardware/ s<strong>of</strong>tware.<br />
k) Upon successful installation <strong>of</strong> all the supplied Hardware/ S<strong>of</strong>tware, the SI shall submit<br />
the lot-wise installation reports (in original) duly verified by the respective nodal <strong>of</strong>ficer/<br />
end-user where the Hardware/ S<strong>of</strong>tware has been installed by him.<br />
l) The SI, during installation, shall not cause any damage to government premises/<br />
property and upon successful installation, if tampered/ damaged, will perform<br />
restoration <strong>of</strong> the site to its original state at his own cost. All the installation work shall<br />
be done by the SI in a conscientious manner and as per the OEM guidelines, best<br />
industry practices, and all regulatory norms, as applicable. It shall be the responsibility<br />
<strong>of</strong> the selected bidder to bring all the equipment and tools required for installation <strong>of</strong> the<br />
supplied items.<br />
2) Phase-II: Testing & Commissioning<br />
a) DoIT&C, upon receipt <strong>of</strong> all the lot-wise installation reports from the SI, shall validate<br />
the same as per work order/ bidding document for its compliance. SI shall assist<br />
DoIT&C during this process i.e. Acceptance Testing (AT) by DoIT&C.<br />
Page 14 <strong>of</strong> 90