Final RFP - IT Hardware for e-Secretariat & other Projects<br />

DoIT&C, Govt. <strong>of</strong> <strong>Rajasthan</strong>”, media, manuals and OEM support, updates, patches,<br />

and errata for the entire project period i.e. 5 years after successful commissioning.<br />

f) The supplied anti-virus clients should be installed on all the supplied desktop/ laptop/<br />

workstation computers.<br />

g) DoIT&C, upon receipt <strong>of</strong> delivery <strong>of</strong> all the ordered items as per prescribed timeschedule<br />

(lot-wise), shall verify the same in accordance with the delivery challan and<br />

thereafter inspect all the supplied items (upto 10% <strong>of</strong> each item type on a random<br />

sample basis) during the respective delivery to validate them in compliance with the<br />

work order.<br />

h) SI, after successful inspection (lot-wise) <strong>of</strong> supplied items by DoIT&C, shall carry from<br />

DoIT&C stores & install all the supplied items at designated project locations at his own<br />

cost. The SI shall install and configure the all the supplied licensed s<strong>of</strong>tware on<br />

respective hardware. Also, the SI shall integrate all the peripheral devices like printer,<br />

scanner, bar-code reader, etc. with Dekstop/ Laptop computer etc.<br />

i) The SI, wherever required & applicable, shall connect the supplied items to the existing<br />

SecLAN-MAN/ NIC network such that the end-user is able to access the SDC/ NIC<br />

infrastructure/ services <strong>of</strong> SecLAN-MAN/ NIC Network. This would require the SI to<br />

configure a given IP address on the installed equipment (Desktop, Laptop, Printer,<br />

Switch, etc.) as per SecLAN-MAN/ NIC IP addressing policy.<br />

j) All the equipment installed should bear a printed sticker tag consisting <strong>of</strong> SI Name,<br />

Helpdesk number, email address and URL which shall be referred to by the end-users<br />

for reporting any problem/ fault in the installed hardware/ s<strong>of</strong>tware.<br />

k) Upon successful installation <strong>of</strong> all the supplied Hardware/ S<strong>of</strong>tware, the SI shall submit<br />

the lot-wise installation reports (in original) duly verified by the respective nodal <strong>of</strong>ficer/<br />

end-user where the Hardware/ S<strong>of</strong>tware has been installed by him.<br />

l) The SI, during installation, shall not cause any damage to government premises/<br />

property and upon successful installation, if tampered/ damaged, will perform<br />

restoration <strong>of</strong> the site to its original state at his own cost. All the installation work shall<br />

be done by the SI in a conscientious manner and as per the OEM guidelines, best<br />

industry practices, and all regulatory norms, as applicable. It shall be the responsibility<br />

<strong>of</strong> the selected bidder to bring all the equipment and tools required for installation <strong>of</strong> the<br />

supplied items.<br />

2) Phase-II: Testing & Commissioning<br />

a) DoIT&C, upon receipt <strong>of</strong> all the lot-wise installation reports from the SI, shall validate<br />

the same as per work order/ bidding document for its compliance. SI shall assist<br />

DoIT&C during this process i.e. Acceptance Testing (AT) by DoIT&C.<br />

Page 14 <strong>of</strong> 90