New Legaspi Airport Draft FS - PPP Center
New Legaspi Airport Draft FS - PPP Center
New Legaspi Airport Draft FS - PPP Center
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 4.1-2 Planning Criteria and Parameters (Vertical Components)<br />
Components<br />
1. Passenger Terminal<br />
Building<br />
4-2<br />
Future Requirements<br />
Year 2015 Year 2025<br />
5,620 sq.m. 6,640 sq.m.<br />
2. Cargo Terminal Building 200 sq.m. 400 sq.m.<br />
3. Administration Building 1,800 sq.m. 1,800 sq.m.<br />
4. Fire Station Building 270 sq.m. 270 sq.m.<br />
5. Access Road Two-way, Two Lane Two-way, Two Lane<br />
6. Car Park 6,000 sq.m. 7,000 sq.m.<br />
7. Air Navigation Systems Cat I ILS Cat I ILS<br />
8. Rescue and Fire Fighting<br />
− Category<br />
− Fire Vehicles<br />
9. Public Utilities<br />
− Power Supply<br />
− Water Supply<br />
− Sewage Disposal<br />
− Solid Waste Disposal<br />
− Telephone Trunk line<br />
6<br />
min 2<br />
1200 KVA<br />
150 cu.m./day<br />
150 cu.m./day<br />
75 extensions, 25 trunkline<br />
6<br />
min 2<br />
1200 KVA<br />
150 cu.m./day<br />
150 cu.m./day<br />
75 extensions, 25 trunkline<br />
10. Fuel Supply 25 Kl Storage Capacity 50 Kl Storage Capacity<br />
4.2 PLANNING PARAMETERS<br />
4.2.1 General<br />
The physical characteristics of airports to satisfy internationally accepted<br />
standards for operational efficiency and safety are prescribed under ICAO<br />
Annex 14, among other references. ICAO Annex 14 specifies the minimum<br />
configuration and physical characteristics of runway, taxiway and apron in<br />
accordance with an aerodrome reference code and approach category of the<br />
airport runway.<br />
A set of interrelated planning criteria needs to be considered in determining<br />
the required parameters for the airport physical plan. These criteria consist<br />
of:<br />
a) design aircraft<br />
b) aerodrome reference code<br />
c) runway dimensions<br />
d) approach category of runway