5.1.2 Implications of Option I (Improving the Existing <strong>Legaspi</strong> <strong>Airport</strong><br />
Facilities)<br />
This strategy requires the doubling of the existing runway strip and shifting the<br />
aircraft-parking apron together with the terminal facilities to satisfy the<br />
requirements of the precision approach runway. A possible scheme for<br />
general development, while keeping the airport operational, is shown in<br />
Figure 5.1-1.<br />
The existing runway at the <strong>Legaspi</strong> <strong>Airport</strong> is more than enough to<br />
accommodate domestic operation of A320, and B737 if obstacles surrounding<br />
the airport are removed. Improving the runway for precision approach may be<br />
undertaken by shortening the runway to 2,000-m so that the 300-m wide<br />
runway strip, together with the localizer area and runway end safety area<br />
could be established without diverting the nearby Yawa river. However, a<br />
portion of the Bagtang river and the road located at the southern end of the<br />
airport need to be diverted, together with other roads in the vicinity. The<br />
terminal facilities including aircraft parking apron would need to be<br />
redeveloped beside the existing terminal area with adequate separation<br />
distance from the runway centerline.<br />
The precision approach will be established for Rwy 06, and one (1) set of<br />
Instrument Landing System (ILS), consisting of localizer and glide path/DME<br />
should be installed. In order to ensure adequate signal performance of the<br />
equipment, the localizer (to be located at the northern end of the runway) and<br />
glide path critical areas should be provided and properly graded. Rwy 24-end<br />
should be displaced to the south by 300-m to accommodate the localizer<br />
critical area and avoid diversion of the Yawa river. The glide path critical area<br />
would be provided along the southwestern part of the expanded runway strip.<br />
However, due to the existing alignment of the Manila-<strong>Legaspi</strong> railway, the<br />
length of the precision approach lighting system would be limited to<br />
approximately 500-m which could result in operational limitation of the ILS<br />
approach procedure.<br />