5.1.2 Implications of Option I (Improving the Existing <strong>Legaspi</strong> <strong>Airport</strong><br />

Facilities)<br />

This strategy requires the doubling of the existing runway strip and shifting the<br />

aircraft-parking apron together with the terminal facilities to satisfy the<br />

requirements of the precision approach runway. A possible scheme for<br />

general development, while keeping the airport operational, is shown in<br />

Figure 5.1-1.<br />

The existing runway at the <strong>Legaspi</strong> <strong>Airport</strong> is more than enough to<br />

accommodate domestic operation of A320, and B737 if obstacles surrounding<br />

the airport are removed. Improving the runway for precision approach may be<br />

undertaken by shortening the runway to 2,000-m so that the 300-m wide<br />

runway strip, together with the localizer area and runway end safety area<br />

could be established without diverting the nearby Yawa river. However, a<br />

portion of the Bagtang river and the road located at the southern end of the<br />

airport need to be diverted, together with other roads in the vicinity. The<br />

terminal facilities including aircraft parking apron would need to be<br />

redeveloped beside the existing terminal area with adequate separation<br />

distance from the runway centerline.<br />

The precision approach will be established for Rwy 06, and one (1) set of<br />

Instrument Landing System (ILS), consisting of localizer and glide path/DME<br />

should be installed. In order to ensure adequate signal performance of the<br />

equipment, the localizer (to be located at the northern end of the runway) and<br />

glide path critical areas should be provided and properly graded. Rwy 24-end<br />

should be displaced to the south by 300-m to accommodate the localizer<br />

critical area and avoid diversion of the Yawa river. The glide path critical area<br />

would be provided along the southwestern part of the expanded runway strip.<br />

However, due to the existing alignment of the Manila-<strong>Legaspi</strong> railway, the<br />

length of the precision approach lighting system would be limited to<br />

approximately 500-m which could result in operational limitation of the ILS<br />

approach procedure.<br />