Table 5.1-2 Evaluations of Potential Sites for Development Option III (Cont’d)<br />
Potential Sites<br />
Criteria<br />
Borabod, Castilla, Sorsogon<br />
Bariis, <strong>Legaspi</strong> City<br />
Villahermosa, Daraga, Albay<br />
Alobo, Daraga, Albay<br />
The existing land use in the area The area is devoted to coconut The land use prevailing in the The land use prevailing in the<br />
is agricultural and devoted to rice plantation and covered by area is a mixed coconut and area is agricultural, and devoted<br />
plantation. Reports stated that a Comprehensive Agrarian Reform grass the area is also covered by to rice land. The irrigation<br />
study for irrigation on the area Program. (CARP).<br />
Comprehensive Agrarian Reform system on the area is not<br />
was previously conducted.<br />
Program (CARP).<br />
functioning<br />
However, during the site<br />
reconnaissance the area was<br />
noted to be not irrigated.<br />
Land Use<br />
The social impact from Several houses will be directly<br />
resettlement is minimal as it was affected by airport construction,<br />
noted that the area is thinly requiring a large-scale<br />
populated. No aircraft noise resettlement plan. No aircraft<br />
problem on urban centers is noise problem is expected on<br />
expected. However, a relocation major urban centers<br />
site is located near the north<br />
portion of the approach. Actual<br />
extent of relocation site needs<br />
confirmation.<br />
Minimal resettlement is required<br />
since the area is thinly<br />
populated. No aircraft noise<br />
influence is expected to major<br />
urban centers<br />
Some houses will be directly<br />
affected by airport construction<br />
and need to be relocated. No<br />
aircraft noise influence is<br />
expected on major urban<br />
centers.<br />
Environmental<br />
Factor<br />
5-12<br />
The runway will cross an existing The runway will run across an Diversion of existing power line<br />
power line; necessary diversion existing road; thus, diversion is on the northern part of the site is<br />
of the power line is required. required.<br />
required. The runway will crossexisting<br />
waterways and needs to<br />
diverted<br />
The runway crosses the<br />
barangay road, diversion is<br />
required. The site is<br />
complementary to future urban<br />
expansion of Metro <strong>Legaspi</strong>.<br />
Others