JDMFG_CATALOG_Full__15I
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Mighty Mat Installation<br />
Basic Installation Recommendations. For detailed installation instructions refer to the installation manual.<br />
Hold Down<br />
Trim beginning and ending mats and place flush to a wall or install<br />
a piece of hold down for trimmed mat to rest flush against.<br />
For alley edge, install the hold down ½” from the edge of<br />
the stall platform, and secure with anchors every 24".<br />
There are no anchors or fasteners that get<br />
installed in the Mighty Mat. Interlock<br />
the mats and lay flat against the<br />
hold down.<br />
SDP4865G<br />
Mighty Mat<br />
24"<br />
2"<br />
HD10326<br />
Anchor<br />
½"<br />
PP10177<br />
Hold Down<br />
Expansion Joint<br />
Install an Expansion Joint approximately every 15 mats. The Expansion Joint should be positioned under a stall loop, so it does not interfere<br />
with the comfort of the cow. Secure expansion joint with 6 anchors.<br />
•<br />
13 14 15<br />
•<br />
16 17 18<br />
•<br />
•<br />
•<br />
•<br />
MC13645<br />
Expansion Joint<br />
HD10225<br />
Split Nail Anchor<br />
6200 Highway 12, Eau Claire, WI 54701<br />
ph. 800-998-2398 • fax. 888-972-4454<br />
JD11C_1610<br />
ph. 715-834-1439 • fax. 715-834-3812<br />
www.jdmfg.com • e-mail: jdmfg@jdmfg.com