07.12.2012 Views

Instruction Sheet - Agentur KONSENS

Instruction Sheet - Agentur KONSENS

Instruction Sheet - Agentur KONSENS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Working platforms / working equipment S3.32<br />

Exhibition Center Nuremberg NürnbergMesse GmbH<br />

Contractor *<br />

29.3.–1.4.2012<br />

Herrn Lukas Handrich<br />

Messezentrum<br />

SAG GmbH<br />

ServicePartnerCenter<br />

90471 Nürnberg<br />

Messezentrum 1<br />

90471 Nürnberg<br />

Fax +49 (0) 9 11. 86 06-12 83 81 Tel +49 (0) 9 11. 81 88 18-0<br />

Fax +49 (0) 9 11. 81 88 18-19<br />

sag-messe@sag.eu<br />

Company<br />

Street<br />

Postcode, Town, Country<br />

Tel<br />

Fax<br />

E-mail<br />

Order<br />

1. Working platforms (charged by calendar days)<br />

Daily rental charges without operating staff<br />

� 1.1 Articulated work platform (cherry picker) up to 10 m,<br />

lateral working radius approx. 5 m EUR 202.65 / day<br />

assembly from __________ till __________ _____ piece(s) ____ day(s)<br />

assembly from __________ till __________ _____ piece(s) ____ day(s)<br />

dismantling from __________ till __________ _____ piece(s) ____ day(s)<br />

dismantling from __________ till __________ _____ piece(s) ____ day(s)<br />

� 1.2 Scissor work platform up to 7 m EUR 118.55 / day<br />

assembly from __________ till __________ _____ piece(s) ____ day(s)<br />

assembly from __________ till __________ _____ piece(s) ____ day(s)<br />

dismantling from __________ till __________ _____ piece(s) ____ day(s)<br />

dismantling from __________ till __________ _____ piece(s) ____ day(s)<br />

� 1.3 Scissor work platform up to 12 m EUR 172.50 / day<br />

assembly from __________ till __________ _____ piece(s) ____ day(s)<br />

assembly from __________ till __________ _____ piece(s) ____ day(s)<br />

dismantling from __________ till __________ _____ piece(s) ____ day(s)<br />

dismantling from __________ till __________ _____ piece(s) ____ day(s)<br />

� 1.4 Delivery and collection of each work platform EUR 86.20 / piece<br />

delivery on _______ ____ piece(s) + collection on _______ ____ piece(s)<br />

delivery on _______ ____ piece(s) + collection on _______ ____ piece(s)<br />

delivery on _______ ____ piece(s) + collection on _______ ____ piece(s)<br />

delivery on _______ ____ piece(s) + collection on _______ ____ piece(s)<br />

2. Working equipment (charged by calendar days)<br />

� 2.1 Man lift up to 9.45 m, motor driven,<br />

including delivery and collection EUR 90.55 / day<br />

assembly from __________ till __________ _____ piece(s) ____ day(s)<br />

assembly from __________ till __________ _____ piece(s) ____ day(s)<br />

dismantling from __________ till __________ _____ piece(s) ____ day(s)<br />

dismantling from __________ till __________ _____ piece(s) ____ day(s)<br />

� 2.2 Load lift up to 5.75 m, manual operation,<br />

including delivery and collection EUR 90.55 / day<br />

assembly from __________ till __________ _____ piece(s) ____ day(s)<br />

assembly from __________ till __________ _____ piece(s) ____ day(s)<br />

dismantling from __________ till __________ _____ piece(s) ____ day(s)<br />

dismantling from __________ till __________ _____ piece(s) ____ day(s)<br />

Return deadline<br />

immediately<br />

Person to contact<br />

Tel<br />

Fax<br />

Invoice address (only if different)<br />

VAT ID number of exhibitor:<br />

Place and date Company stamp and authorized signature<br />

Hall/Stand<br />

3. Special vehicles – equipment price on request<br />

________________________________________________________________<br />

________________________________________________________________<br />

________________________________________________________________<br />

________________________________________________________________<br />

4. Work at hourly rate<br />

4.1 Fitter’s hourly rate including all additional charges EUR 35.00 / hour<br />

________________________________________________________________<br />

________________________________________________________________<br />

________________________________________________________________<br />

________________________________________________________________<br />

________________________________________________________________<br />

All prices in EURO plus VAT at the statutory rate.<br />

A surcharge of 25% on fixed-price services and 50% on the hourly rate will be levied<br />

for orders, not submitted two weeks before official assembly date or not known or<br />

which could not be executed until this time due to incomplete or unclear information.<br />

The services ordered must be paid without delay on receipt of the invoice.<br />

The invoice may be issued before the start of assembly or dismantling.<br />

Payment must be received by not later than 3 days before handover.<br />

Note for customers:<br />

The conditions of SAG GmbH are expressly accepted on signing the contract and also<br />

apply to any subsequent hire of equipment or orders.<br />

The orderer ensures that the equipment is used only by persons<br />

– of at least 18 years old,<br />

– in possession of a valid driving authorization,<br />

– trained in the operation, setting up and function of working equipment.<br />

The user himself is responsible for trickle charging the batteries of working platforms<br />

during the hire period.<br />

Please note that only working platforms offered by the ServicePartner SAG<br />

GmbH are allowed to be used on the exhibition site!<br />

* If necessary, NürnbergMesse is entitled to have the service ordered provided by another ServicePartner. In this case, the customer will be notified of the other ServicePartner in<br />

good time.<br />

With our authorized signature below, we acknowledge acceptance of all items of the General and Special Terms of Business of NürnbergMesse and the General Terms of<br />

Business and the Special Conditions for Services of the ServicePartner.<br />

Please turn over!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!