09.12.2012 Views

Charting and Studies User Guide - CQG.com

Charting and Studies User Guide - CQG.com

Charting and Studies User Guide - CQG.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Working with Curves<br />

Page 155<br />

You can add curves for the same set of contracts, but for different periods of time. You can set<br />

that period in preferences.<br />

To add curves<br />

Click a curve button in the lower right corner of the window. Active buttons are orange. A curve<br />

line will be added for each button you click.<br />

To add curves from the chart<br />

Place a vertical line on the chart (click in the date/time area, drag to desired location, click<br />

again).<br />

That vertical line is represented by a curve on the Yield Curve or Forward Curve window.<br />

<strong>Charting</strong> <strong>and</strong> <strong>Studies</strong> <strong>User</strong> <strong>Guide</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!