In April 2020, East River transferred a mobile

substation to the substation serving the 3M plant

near Aberdeen. The sub was moved to provide

an emergency backup to the plant in the event

of any major outages. The 3M plant ramped

up production of N95 masks to meet demand

through the pandemic.

of the plant. Northern has multiple feeds from the

substation to the plant and East River has a dual

transmission feed to the substation. We coordinated

with Northern to ensure the 3M team that our system

was equipped to serve the plant with undisrupted

power, with no scheduled outages or switching and no

planned construction in the area that would affect the

plant. East River system operations put a heightened

awareness on the Aberdeen plant and planned to

bring that substation back on first in the event of an

outage.

As an additional precautionary measure, East River

and Northern Electric moved our mobile substation to

the substation serving 3M to serve as an emergency

8

backup in the rare event we would have had any major

issues in that area.

Advocating for Rural America

From temporary slowdowns and shutdowns of

food processing plants to ethanol plant workforce

reductions, slowdowns and shutdowns, rural America

suffered significant economic impacts caused by the

COVID-19 pandemic.

The nationwide steep drop in liquid fuel demand

during the pandemic resulted in a major economic

impact on biofuels processing plants across the

country. Estimates show as much as half of U.S.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!