Transmission System

UPGRADE

PLAN

In 2020, East River marked the midway

point of our 2018-2021 construction

work plan. We are also now well into the

development and construction of many

of the projects that are outlined within

our Transmission System Upgrade Plan.

The upgrade plan, which will invest about $700

million over 10 to 12 years to accelerate additions

and replacements to our infrastructure, was originally

approved by East River’s board of directors in August

2018.

The plan’s approval came with the understanding that

it will be reassessed during each year’s budgeting

22

process and can be adapted as needed based on new

technologies, power supply costs, or other changes.

East River set the upgrade plan into motion at the

start of 2019 by submitting a RUS construction work

plan and receiving approval on the first four years

of work outlined within the upgrade plan. East River

also reorganized and expanded staff to carry out the

upgrade plan’s work while continuing to maintain the

current system.

“East River’s upgrade plan will provide for new load

growth, strengthen the backbone of our transmission

system, replace aging infrastructure that has passed

its useful life, meet the reliability expectations of

our membership, develop and implement optimized

planning and design criteria and increase the