10.08.2020 Views

East River Electric 2020 Annual Report

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

East River crews worked during summer 2020

on installing equipment at the Bryant substation.

The project is being completed to strengthen

the transmission system serving Codington-

Clark Electric and H-D Electric.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!