ARCHITECTURAL MODELLING<br />

T H E M O S T D E M A N D I N G P A R T O F T H E P R O J E C T<br />

The architectural model is the basis for all<br />

other disciplines, that is why it is the most<br />

demanding and responsible part of work.<br />

If something goes wrong in the<br />

architectural model, the cost of changes is<br />

too high, as it affects every other project<br />

party.<br />

The very first challenge is that another<br />

company did the initial project. From the<br />

time of submission of the conceptual<br />

design, a lot of changes happened, that<br />

have to be implemented in a new design.<br />

One of the significant modifications was a<br />

complete change of the structural schema<br />

- from the precast concrete system to a<br />

monolithic type. High demand on the<br />

market for prefabricated concrete panels<br />

did not allow the construction to be<br />

finished on time.<br />

The architectural model is in Revit based<br />

on the template and according to the<br />

investor standard. The model of LOD 350<br />

will be delivered at the end of the detailed<br />

design phase.<br />

6