4.1.2 Latin America<br />
��� ����� ������� ��� ������� ������� �� ��������� ����� ������ ��<br />
Companhia Paranense de Energia, the largest power distribution<br />
<strong>and</strong> transmission company in the state of Paraná with over 380<br />
substations <strong>and</strong> 183.280 km in lines. The contract includes the<br />
execution a turn-key venture comprising 2 complete bays with 500<br />
kV, which will be executed in the substations of Araraquara II <strong>and</strong><br />
Taubaté, in the state of São Paulo. <strong>Efacec</strong> is responsible for carrying<br />
out all activities concerning this venture, from basic engineering,<br />
������������������������������������������������������������������<br />
constructions, electromechanical assembly, protection/control<br />
system, automation, telecommunication, commissioning <strong>and</strong><br />
��������������������������������������������������������������������<br />
�����������������������������<br />
In Brazil, a contract was signed with ENERGEST for the supply of a<br />
GOC (Generation Operations Center). ENERGEST is a company of<br />
the EDP Group responsible for managing about 400 MW installed<br />
������������������������������������������������������������������<br />
X platform that currently manages power distribution grids in<br />
���� ���������� �������� ���� �������� ����� ���� ��� ���������� ���� ����<br />
management of power generation. This will allow hydroelectric<br />
utilities <strong>and</strong> small hydroelectric power plants to be supervised<br />
<strong>and</strong> controlled remotely from the operational management center<br />
���������������������������������������������������<br />
<strong>Efacec</strong> do Brasil won the tender for the expansion of the substations<br />
of Ji-Paraná, located in the State of Rondônia <strong>and</strong> Mir<strong>and</strong>a II, in<br />
the State of Maranhão, which include the protection, control <strong>and</strong><br />
supervision system, construction works <strong>and</strong> electromechanical<br />
erection, as well as the supply of several equipments <strong>and</strong> materials.<br />
View of the Taubaté Substation<br />
50<br />
������ ���� ��������� ����� ������� ��������� ������� ��� ���� ������������<br />
sector of the Brazilian market.<br />
�������������������������������������������������������������������<br />
�����������������������������������������������������������������<br />
(10%)] for the electrical works of a 150-MW wind farm, located in<br />
��������������������������������������������������������<br />
<strong>Efacec</strong> do Brasil won an important tender from the Companhia<br />
do Metropolitano de São Paulo – Metrô (metro company of São<br />
�������������������������������������������������������������������<br />
����������������������������������������������������������������������<br />
World Cup 2014. This new line, which will connect the Congonhas<br />
Airport to the region of Morumbi will have a length of 21.5 km<br />
<strong>and</strong> include 20 stations. In this contract, <strong>Efacec</strong>’s scope of works<br />
Virtual image of the new line 17 of the São Paulo Metro