4.1.2 Latin America<br />

��� ����� ������� ��� ������� ������� �� ��������� ����� ������ ��<br />

Companhia Paranense de Energia, the largest power distribution<br />

<strong>and</strong> transmission company in the state of Paraná with over 380<br />

substations <strong>and</strong> 183.280 km in lines. The contract includes the<br />

execution a turn-key venture comprising 2 complete bays with 500<br />

kV, which will be executed in the substations of Araraquara II <strong>and</strong><br />

Taubaté, in the state of São Paulo. <strong>Efacec</strong> is responsible for carrying<br />

out all activities concerning this venture, from basic engineering,<br />

������������������������������������������������������������������<br />

constructions, electromechanical assembly, protection/control<br />

system, automation, telecommunication, commissioning <strong>and</strong><br />

��������������������������������������������������������������������<br />

�����������������������������<br />

In Brazil, a contract was signed with ENERGEST for the supply of a<br />

GOC (Generation Operations Center). ENERGEST is a company of<br />

the EDP Group responsible for managing about 400 MW installed<br />

������������������������������������������������������������������<br />

X platform that currently manages power distribution grids in<br />

���� ���������� �������� ���� �������� ����� ���� ��� ���������� ���� ����<br />

management of power generation. This will allow hydroelectric<br />

utilities <strong>and</strong> small hydroelectric power plants to be supervised<br />

<strong>and</strong> controlled remotely from the operational management center<br />

���������������������������������������������������<br />

<strong>Efacec</strong> do Brasil won the tender for the expansion of the substations<br />

of Ji-Paraná, located in the State of Rondônia <strong>and</strong> Mir<strong>and</strong>a II, in<br />

the State of Maranhão, which include the protection, control <strong>and</strong><br />

supervision system, construction works <strong>and</strong> electromechanical<br />

erection, as well as the supply of several equipments <strong>and</strong> materials.<br />

View of the Taubaté Substation<br />

50<br />

������ ���� ��������� ����� ������� ��������� ������� ��� ���� ������������<br />

sector of the Brazilian market.<br />

�������������������������������������������������������������������<br />

�����������������������������������������������������������������<br />

(10%)] for the electrical works of a 150-MW wind farm, located in<br />

��������������������������������������������������������<br />

<strong>Efacec</strong> do Brasil won an important tender from the Companhia<br />

do Metropolitano de São Paulo – Metrô (metro company of São<br />

�������������������������������������������������������������������<br />

����������������������������������������������������������������������<br />

World Cup 2014. This new line, which will connect the Congonhas<br />

Airport to the region of Morumbi will have a length of 21.5 km<br />

<strong>and</strong> include 20 stations. In this contract, <strong>Efacec</strong>’s scope of works<br />

Virtual image of the new line 17 of the São Paulo Metro