Embassy Hanoi and Consulate General Ho Chi Minh - OIG - US ...
Embassy Hanoi and Consulate General Ho Chi Minh - OIG - US ...
Embassy Hanoi and Consulate General Ho Chi Minh - OIG - US ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SENSITIVE BUT UNCLASSIFIED<br />
<strong>Embassy</strong> <strong>Hanoi</strong> does not have complete <strong>and</strong> accurate st<strong>and</strong>ard operating procedures.<br />
Informal Recommendation 20: <strong>Embassy</strong> <strong>Hanoi</strong> should review <strong>and</strong> correct the<br />
current procedures <strong>and</strong> develop <strong>and</strong> document any missing procedures.<br />
The local CCB has not approved several applications in the April 2005 regional<br />
computer security officer report that are already on the <strong>Hanoi</strong> system. Furthermore,<br />
the embassy has not notified the Department of these local applications.<br />
Informal Recommendation 21: <strong>Embassy</strong> <strong>Hanoi</strong> should have the local change<br />
control board approve all nonbaseline software that is used on the systems in <strong>Hanoi</strong><br />
<strong>and</strong> <strong>Ho</strong> <strong>Chi</strong> <strong>Minh</strong> City.<br />
Locally developed applications have not been submitted to the Department for<br />
approval <strong>and</strong> certification <strong>and</strong> accreditation. These applications include a trouble<br />
ticket application (discussed above), a GSO vehicle request application, <strong>and</strong> a<br />
travel order request application.<br />
Informal Recommendation 22: <strong>Embassy</strong> <strong>Hanoi</strong> should remove locally developed<br />
applications from the system until the Department has approved them. If approved,<br />
the embassy should submit the applications for certification <strong>and</strong> accreditation.<br />
The public affairs section purchased software for tracking contacts that was not<br />
approved by the information management office or the local CCB.<br />
Informal Recommendation 23: <strong>Embassy</strong> <strong>Hanoi</strong> should approve the software <strong>and</strong><br />
coordinate all future purchases through the information management office.<br />
<strong>Embassy</strong> management cannot approve the contingency <strong>and</strong> site security plans<br />
because the plans contain errors <strong>and</strong> inaccurate descriptions of processes. Additionally,<br />
the contingency plan has not been coordinated with the emergency action<br />
plan as required by 12 FAM 600.<br />
Informal Recommendation 24: (b) (2)(b) (2)(b) (2)(b) (2)(b) (2)<br />
(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)<br />
(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)<br />
(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)(b) (2)<br />
(b) (2)(b) (2)<br />
<strong>OIG</strong> Report No. ISP-I-05-28A, Inspection of <strong>Embassy</strong> <strong>Hanoi</strong> <strong>and</strong> CG <strong>Ho</strong> <strong>Chi</strong> <strong>Minh</strong> City, Vietnam, September 2005<br />
SENSITIVE BUT UNCLASSIFIED<br />
67 .