24.01.2013 Views

USER'S GUIDE - ShipWeight

USER'S GUIDE - ShipWeight

USER'S GUIDE - ShipWeight

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

If there are no sub-reports in your report, you can save and close the report.<br />

8.3.4 Change Sub-report Links<br />

If your report contains sub-reports, you most likely will need to filter the data<br />

used in them to include data from the selected project only.<br />

In the Crystal Reports designer, select the sub-report and right click on it with<br />

the mouse. Choose ‘Change Subreport Links…’ from the right-click menu.<br />

The Sub-report Links dialog box opens. In the ‘Available fields’ list, locate and<br />

select the ProjectID parameter (marked by a question mark icon). Press the<br />

8-35<br />

<strong>ShipWeight</strong> – User’s Guide, version 10.0, April 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!