USER'S GUIDE - ShipWeight
USER'S GUIDE - ShipWeight
USER'S GUIDE - ShipWeight
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Estimating Weight and CoG<br />
3.6 Taking uncertainty into account<br />
In the estimation area, the right-hand column contains information about the<br />
standard deviation. The standard deviation can be given either as an absolute<br />
value or as a percentage. To switch between these ways of showing the<br />
uncertainty, select the Std. Dev. in the estimation dialog.<br />
The deviation of the selected estimation coefficient is calculated from the<br />
spread of the coefficients around the regression line. If the number of<br />
coefficients is less than three, the deviation cannot be calculated. Then a<br />
value based upon subjective judgment can be manually entered into the grid.<br />
If some of the other parameters are uncertain, an uncertainty value should be<br />
entered into the grid to the right parameter value. When all parameters have<br />
got appropriate uncertainty value attached, pushing the Calc.std.dev button in<br />
the estimation area gives the total uncertainty for the weight in this weight<br />
group, and this value is stored.<br />
By the use of successive calculation the uncertainty for a weight group<br />
containing subgroups, will be calculated on the basis of the uncertainty of the<br />
subgroups.<br />
Even though the uncertainty is an approximate method to obtain the<br />
uncertainty for a weight and even if you have to set the values yourself for<br />
most weight groups, there are several reasons to take the uncertainty into<br />
account. First of all you will be able to use your resources where they are<br />
most needed. When selecting Most uncertain under the Std. Dev. menu in the<br />
main window, <strong>ShipWeight</strong> will take you to the weight group where a further<br />
estimation and splitting of the group will give the greatest impact on the total<br />
result. This will help you to focus on the weight groups that really matter at<br />
any stage of your estimation. Secondly, taking uncertainty into account will<br />
give you a basis to compare the uncertainty between different projects.<br />
3-14<br />
<strong>ShipWeight</strong> – User’s Guide, version 10.0, April 2011