29.01.2013 Views

Accela Pump Hardware Manual

Accela Pump Hardware Manual

Accela Pump Hardware Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5 Diagnostics<br />

Testing the <strong>Pump</strong> Proportioning<br />

Figure 34. Step gradient profile for testing compositional accuracy<br />

Absorbance (mAU)<br />

600<br />

480<br />

360<br />

240<br />

120<br />

0<br />

Step 1<br />

20%<br />

Step 2<br />

40%<br />

Step 3<br />

60%<br />

Step 4<br />

80%<br />

10 20 30<br />

Time (min)<br />

40 50<br />

Step 5<br />

100%<br />

Step heights should be within ±1% of the theoretical values. In the step gradient shown in<br />

Figure 34, the absorbance value for 100% spiked solvent is 600 mAU (600 mAU – 0 mAU).<br />

Therefore, the theoretical values for the 20%, 40%, 60%, and 80% steps are 120, 240, 360,<br />

and 480 mAU, respectively. A deviation greater than 6 mAU for any of the steps would be a<br />

failing result. If the pump passes both the pulsation and proportioning tests, it is working<br />

properly.<br />

If the pump fails the pulsation test or the proportioning test, try to restore proper<br />

performance by cleaning the proportioning valves as described in “Cleaning the LDA<br />

Components without Disassembling the LDA” on page 56. If this fails to restore proper<br />

pump performance, disassemble and clean the LDA and replace the primary seals as described<br />

in “Replacing the Primary Pistons Seals” on page 67.<br />

48 <strong>Accela</strong> <strong>Pump</strong> <strong>Hardware</strong> <strong>Manual</strong> Thermo Scientific<br />

60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!