parts identification
parts identification
parts identification
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Step 2<br />
*NOTE: Pre-drill holes for all 5/16" Lag Bolts with a 1/8" drill bit.<br />
1. Lay outside Corner Uprights (74) (75) on the ground and measure up 86" and attach Single Arched<br />
Facia (71) and Double Arched Facia (83) using 1/4" Hardware (H1) and 5/16" Hardware (H108). The<br />
ends of the Facias (71) (83) should be flush with the outside faces of the Uprights (74) (75) and the<br />
Uprights should be 84" apart from outside face to outside face.<br />
2. Attach 6 Hole Facias (68) to Corner Uprights (74) (75) using 1/4" Hardware (H1) and 5/16" Hardware<br />
(H108).<br />
*NOTE: Make sure Uprights and Facias are square before tightening Hardware.<br />
3. Center middle Corner Upright (75) between Corner Uprights (74) (75) and attach to Facias (71) (83)<br />
using 1/4" Hardware (H1) and 5/16" Hardware (H108). There should be 37 1/2" between Uprights<br />
when properly installed. Holes in Facias must be oriented as shown in Detail A.<br />
H108<br />
DETAIL A<br />
H108<br />
H1<br />
75<br />
H1<br />
68<br />
1 1/4"<br />
71<br />
37 1/2"<br />
75<br />
75<br />
84"<br />
Upright Assembly<br />
H1<br />
83<br />
21<br />
74<br />
H108<br />
75<br />
UPRIGHTS MUST<br />
BE POSITIONED<br />
AS SHOWN<br />
68<br />
74<br />
86"