NORSK TOTAL KONTRAKT 20<strong>07</strong> <strong>MOD</strong>IFIKASJON - <strong>NTK</strong> <strong>07</strong> <strong>MOD</strong> - NORWEGIAN TOTAL CONTRACT 20<strong>07</strong> <strong>MOD</strong>IFICATION<br />

betales etter art. 17.2 a).<br />

Selskapet har ikke rett til å foreta motregning i<br />

avbestillingsgebyret med andre krav enn de som er<br />

fremsatt overfor Leverandøren før avbestillingsdatoen<br />

og som er godtatt av ham.<br />

17.4 Leverandøren skal etter instruks fra Selskapet gjøre<br />

sitt beste for å avbestille Underleveranser på slike<br />

vilkår som Selskapet kan godta. Hvis Selskapet ikke<br />

kan godta vilkårene for avbestilling, skal<br />

Leverandøren overføre kontrakt om slike<br />

Underleveranser til Selskapet.<br />

17.5 Partene skal opprette Leveringsprotokoll som angir<br />

hver av partenes oppfatning av hvor stor prosentvis<br />

del av Leveransen som er utført, beregnet etter de<br />

prinsipper for fremdriftsberegninger som er fastsatt i<br />

Kontrakten. Selskapet skal også utstede Ferdigattest<br />

som reflekterer Leveringsprotokollen. Reglene i art.<br />

19 gjelder tilsvarende. Leverandøren skal levere<br />

kopier av all design- og innkjøpsdokumentasjon<br />

utarbeidet frem til avbestilling, inkludert slike<br />

dokumenter som ennå ikke er ferdigstilt.<br />

Leverandøren skal også levere et sett tegninger av<br />

Kontraktsgjenstanden som reflekterer faktisk "asbuilt"<br />

status på avbestillingsdato.<br />

Leverandøren skal videre levere kopier av alle planer,<br />

tegninger, spesifikasjoner og andre dokumenter som<br />

Selskapet har rett til å benytte i henhold til art. 33.<br />

17.6 Selskapet skal for egen regning fjerne Leveransen,<br />

Materialer og Selskapsmaterialer fra<br />

Byggeplass(ene). Dersom dette ikke gjøres innen<br />

rimelig tid, kan Leverandøren, etter først å ha varslet<br />

Selskapet, flytte dem til et egnet sted for lagring for<br />

Selskapets regning og risiko. Leverandøren skal inntil<br />

Leveransen, Materialer og Selskapsmaterialer er<br />

fjernet, oppbevare dem på en sikker måte for<br />

Selskapets regning og risiko.<br />

Art. 18 SELSKAPETS RETT TIL MIDLERTIDIG<br />

INNSTILLING AV ARBEIDET<br />

18.1 Selskapet kan ved varsel til Leverandøren kreve at<br />

utførelsen av Arbeidet eller deler av dette blir<br />

midlertidig innstilt.<br />

Varselet skal angi hvilken del av Arbeidet som skal<br />

innstilles, fra hvilken dato dette skal skje og forventet<br />

dato for gjenopptagelse av Arbeidet. Videre skal<br />

angis mobiliseringsplan og eventuelle<br />

støttefunksjoner som skal opprettholdes mens<br />

Arbeidet er innstilt.<br />

Leverandøren skal gjenoppta Arbeidet etter varsel fra<br />

Selskapet. Tidspunktet for gjenopptagelsen av<br />

Arbeidet fastsettes under hensyn til<br />

mobiliseringsplanen og opprettholdte<br />

støttefunksjoner.<br />

- 22 -<br />

not be paid pursuant to Art. 17.2 a).<br />

Company shall only be entitled to deduct from the<br />

cancellation fee such claims as have been<br />

presented to Contractor prior to the date of<br />

cancellation and have been accepted by Contractor.<br />

17.4 Contractor shall, in accordance with Company's<br />

instructions, make his best efforts to cancel<br />

contracts for Subsupply on terms acceptable to<br />

Company. If Company cannot accept the<br />

cancellation terms, then Contractor shall assign<br />

such contracts to Company.<br />

17.5 The parties shall conclude a Delivery Protocol<br />

stating each party's view of the percentage of the<br />

Deliverables completed, calculated in accordance<br />

with the principles of progress measurement stated<br />

in the Contract. Company shall also issue a<br />

Completion Certificate which reflects the Delivery<br />

Protocol. The provisions of Art. 19 shall apply<br />

accordingly. Contractor shall deliver copies of all<br />

design and procurement documentation prepared<br />

up to the cancellation, including such documents as<br />

are not yet completed. Contractor shall also deliver<br />

one set of drawings of the Contract Object reflecting<br />

actual “as-built” status on the cancellation date.<br />

Contractor shall furthermore deliver copies of all<br />

plans, drawings, specifications and other documents<br />

which Company has the right to use in accordance<br />

with Art. 33.<br />

17.6 Company shall, at its own cost, remove the<br />

Deliverables, Materials and Company’s Materials<br />

from the Site(s). If such removal is not done within a<br />

reasonable time, then Contractor may, after having<br />

given notice to Company, remove them to a suitable<br />

location for storage at Company's cost and risk.<br />

Contractor shall, until the Deliverables, Materials<br />

and Company’s Materials have been removed, keep<br />

them in a safe manner at Company's cost and risk.<br />

Art. 18 COMPANY'S RIGHT TO TEMPORARY<br />

SUSPENSION OF THE WORK<br />

18.1 Company may temporarily suspend the<br />

performance of the Work, or parts thereof, by giving<br />

notice to Contractor.<br />

The notice shall specify which part of the Work shall<br />

be suspended, the effective date of the suspension<br />

and the expected date for resumption of the Work.<br />

Furthermore, it shall state the mobilization plan and<br />

any support functions which shall be maintained<br />

while the Work is suspended.<br />

Contractor shall resume the Work after notification<br />

by Company. The date of resumption of the Work<br />

shall be determined with due consideration to the<br />

mobilization plan and the support functions<br />

maintained during suspension.