30.04.2014 Views

ETT-projektet. Arbetsrapport 758-2012.pdf - Ny Teknik

ETT-projektet. Arbetsrapport 758-2012.pdf - Ny Teknik

ETT-projektet. Arbetsrapport 758-2012.pdf - Ny Teknik

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

distribution at maximum load and satisfactory agility. Moreover they all use<br />

the same standard modules and are therefore part of a co-modal transport<br />

system. The present timber transport combination, truck and full trailer,<br />

within 60 ton and 24 m has been the reference in the study. Truck, link,<br />

link and semitrailer heavily failed in the agility analysis. However, it is<br />

known to have a good stability. The new trailer modules are possible to<br />

combine with present timber trucks.<br />

42<br />

<strong>ETT</strong>-Modulsystem för skogstransporter – En Trave Till (<strong>ETT</strong>) och Större Travar (ST)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!