Montage- und Gebrauchsanleitung Universal Anschlagpunkt 115
Montage- und Gebrauchsanleitung Universal Anschlagpunkt 115
Montage- und Gebrauchsanleitung Universal Anschlagpunkt 115
Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.
YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.
6. Technical data 7. Care, maintenance, inspection<br />
Manufacturer:<br />
Hailo Wind Systems GmbH & Co. KG<br />
Daimlerstraße 2, 35708 Haiger, Germany<br />
<strong>Universal</strong> anchorage point – performance data<br />
Nominal work load limit (WLL)<br />
22,24 kN<br />
No. of persons max. 2<br />
Bolts for securing anchor point M16 - 8.8<br />
Torque M 16 - 8.8<br />
Dowel pull-out strength<br />
Dowel torque<br />
+49 (0) 2773 82-0<br />
+49 (0) 2773 82-1561<br />
E-Mail: info@ hailo-windsystems.de<br />
Website: www.hailo-windsystems.com<br />
210 Nm<br />
≥ 12 kN<br />
Please refer to the information<br />
provided by the relevant manufacturer<br />
Dimensions of the universal anchorage point:<br />
• Any contamination is to be cleaned off with clean water,<br />
removing the remaining water with a dry cloth.<br />
• Make sure that the universal anchorage point does not<br />
come into contact with acids or any other fluids.<br />
• The user must carry out a visual and manual inspection<br />
of the universal anchorage point each time before it is<br />
used.<br />
• Check that all the components are correctly secured and<br />
that no distortion, damage, cracks or other defects of<br />
any kind can be identified.<br />
• The wear sustained by equipment does of course depend<br />
on the length of service and type of use to which it is<br />
put. It is therefore difficult to state what the exact<br />
service life will be as it depends on the extent and<br />
frequency of use and on the environment in which it is<br />
used.<br />
In order to guarantee the safety of the anchorage<br />
point, the fitting and all the components must be<br />
inspected at intervals of at least once a year based<br />
on the stress imposed during use. This inspection must<br />
be carried out by a trained/authorised person using the<br />
inspection schedule provided in these instructions for<br />
fitting and use.<br />
The anchorage point must also be inspected in the event<br />
of damage and following any exceptional events.<br />
36<br />
Instructions for fitting and use • <strong>Universal</strong> anchorage point • Revised 2013-11/GB/02