Untitled - Future Pipe Industries
Untitled - Future Pipe Industries
Untitled - Future Pipe Industries
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3.4.2: Maximum cover height<br />
The maximum cover height depends on the type of installation, backfill material, its compaction, as well as native soil conditions.<br />
The figures below are for installation in good and stable native soils, and which provide adequate support for the<br />
pipes. Detailed selection tables, for each stiffness class, are shown in tables 5, 6, 7 and 8.<br />
Maximum Cover Depth for pipe installed in :<br />
Table 3<br />
Stiffness Class (psi) SN 18 SN 36 SN 46 SN 72<br />
Fully compacted gravel 46 ft 53 ft 54 ft 58 ft<br />
Full clean Sand compacted to 90% Std proctor 26 ft 43 ft 44 ft 48 ft<br />
Full mixed Sand compacted<br />
to 90% Std proctor<br />
20 ft 25 ft 26 ft 30 ft<br />
Clean Sand compacted to 90% Std Proctor to 70 % of pipe ID N.R 16 ft 17 ft 23 ft<br />
Lightly tamped full clean sand** N.R 4ft 5ft 9ft<br />
7