22.02.2013 Views

Untitled - Future Pipe Industries

Untitled - Future Pipe Industries

Untitled - Future Pipe Industries

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.4.2: Maximum cover height<br />

The maximum cover height depends on the type of installation, backfill material, its compaction, as well as native soil conditions.<br />

The figures below are for installation in good and stable native soils, and which provide adequate support for the<br />

pipes. Detailed selection tables, for each stiffness class, are shown in tables 5, 6, 7 and 8.<br />

Maximum Cover Depth for pipe installed in :<br />

Table 3<br />

Stiffness Class (psi) SN 18 SN 36 SN 46 SN 72<br />

Fully compacted gravel 46 ft 53 ft 54 ft 58 ft<br />

Full clean Sand compacted to 90% Std proctor 26 ft 43 ft 44 ft 48 ft<br />

Full mixed Sand compacted<br />

to 90% Std proctor<br />

20 ft 25 ft 26 ft 30 ft<br />

Clean Sand compacted to 90% Std Proctor to 70 % of pipe ID N.R 16 ft 17 ft 23 ft<br />

Lightly tamped full clean sand** N.R 4ft 5ft 9ft<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!