24.02.2013 Views

Section 1 Introduction - National Marine Fisheries Service - NOAA

Section 1 Introduction - National Marine Fisheries Service - NOAA

Section 1 Introduction - National Marine Fisheries Service - NOAA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Date<br />

NBK at Bangor EHW-1 Pile Replacement Project Final <strong>Marine</strong> Mammal Monitoring Report<br />

Time<br />

Observation<br />

Initiated:<br />

Time<br />

Observation<br />

Completed:<br />

Latitude Longitude Sighting<br />

Time<br />

Species<br />

Number<br />

of<br />

Animals<br />

Construction<br />

Type<br />

Construction<br />

Monitoring<br />

(Before/ During/<br />

After)<br />

Distance<br />

(m)/Direction<br />

to Animals (°)<br />

Bangor, Washington E-2<br />

Behavior<br />

Estimated<br />

Distance to<br />

Pile<br />

(m)<br />

Weather<br />

Conditions<br />

EHW 5-Oct-11 07:20 17:23 47 45.215 122 43.468 07:38 HSEA 1 NA NA 3M/SE OF PILE DI 4 OC 1<br />

EHW 5-Oct-11 07:06 09:06<br />

07:40 HSEA 1 NA NA<br />

50/270 from<br />

northeast corner<br />

of EHW<br />

building<br />

DI 150 S<br />

EHW 5-Oct-11 07:20 17:23 47 45.255 122 43.455 07:44 HSEA 1 NA NA 6/250 SW,LO,DI 50 OC 1<br />

EHW 5-Oct-11 07:06 09:06<br />

EHW 5-Oct-11 07:06 09:06<br />

07:48 HSEA 1 NA NA 40/0 DI 30 S<br />

08:00 HSEA 1 V Before 50/45 DI 45 S<br />

EHW 5-Oct-11 07:20 09:07 47 45.123 122 43.459 08:10 HSEA 1 V Before 20/17 SW,LO,DI 170 OC 1<br />

EHW 5-Oct-11 07:06 09:06<br />

EHW 5-Oct-11 07:06 09:06<br />

08:11 HSEA 1 V Before 40/270 DI 40 S<br />

08:13 HSEA 1 V Before 40/270 DI 40 S<br />

EHW 5-Oct-11 07:20 17:23 47 45.306 122 43.478 08:45 HSEA 1 V After 10/340 MI,SI 160 OC 1<br />

EHW 5-Oct-11 07:20 09:07 47 45.123 122 43.459 08:51 HSEA 1 V After 125/17 SW,DI 225 OC 1<br />

EHW 5-Oct-11 07:20 17:23 47 45.199 122 43.529 09:00 HSEA 1 V After 80/355 SW,DI 100 OC 1<br />

EHW 5-Oct-11 07:06 09:06<br />

09:05 HSEA 1 V After 40/315 DI 20 S<br />

EHW 6-Oct-11 07:50 16:42 47 43.680 122 44.735 08:16 HPOR 4 NA NA 100/175 SW(W) 2,800 OC 1-2<br />

Beaufort<br />

Sea State<br />

Notes<br />

Reported by MC , first seen<br />

hauled out on float, 3 m<br />

from pile, 07:39 seen<br />

outside containment boom<br />

in EZ.<br />

Distance noted from capstan<br />

at south end of EHW, unless<br />

otherwise noted.<br />

Up in EZ, heading 210<br />

degrees down center of piles<br />

towards pile to be driven,<br />

08:00 in EZ under piles,<br />

08:09 forward dive in EZ,<br />

08:11 up in EZ, 08:13 up in<br />

EZ.<br />

07:39-08:28, HSEA in and<br />

out of EZ.<br />

Seen during 30 minute postdrive<br />

outside north end<br />

EHW.<br />

Heading south, at 09:03 still<br />

heading south.<br />

Used EHW for distance to<br />

pile; sighted southeast of<br />

Charlie buoy<br />

EHW 6-Oct-11 08:45 17:35 47 45.266 122 43.553 09:05 HSEA 1 NA NA 50/100 SW(S),DI 100 PC 2 Heading south.<br />

EHW 6-Oct-11 08:45 17:35 47 45.271 122 43.461 09:10 HSEA 1 NA NA 15/100 LO,DI - PC 1<br />

EHW 6-Oct-11 08:45 17:35 47 45.127 122 43.435 09:17 HSEA 1 NA NA 200/330 TR - OC 0<br />

EHW 6-Oct-11 08:45 17:35 47 45.271 122 43.461 09:24 HSEA 1 NA NA 30/277 LO,DI 10 PC 1<br />

EHW 6-Oct-11 08:45 17:35 47 45.127 122 43.435 09:36 HSEA 1 NA NA 150/115 TR - OC 0<br />

EHW 6-Oct-11 07:50 16:42 47 46.855 122 43.401 09:50 HSEA 1 NA NA 50/274 LO,RE,SI 3,506 OC 2<br />

On the hook inside EHW1,<br />

no distance, since we do not<br />

know where pile will be.<br />

Attached to Columbia,<br />

swimming at 225 degrees.<br />

Note: distance is to "forks"<br />

on Scandia, barge has yet to<br />

be moved so don't know<br />

where the pile will be.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!