Section 1 Introduction - National Marine Fisheries Service - NOAA
Section 1 Introduction - National Marine Fisheries Service - NOAA
Section 1 Introduction - National Marine Fisheries Service - NOAA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Project Date<br />
NBK at Bangor EHW-1 Pile Replacement Project Final <strong>Marine</strong> Mammal Monitoring Report<br />
Time<br />
Observation<br />
Initiated:<br />
Time<br />
Observation<br />
Completed:<br />
Latitude Longitude Sighting<br />
Time<br />
Species<br />
Number<br />
of<br />
Animals<br />
Construction<br />
Type<br />
Construction<br />
Monitoring<br />
(Before/ During/<br />
After)<br />
Distance<br />
(m)/Direction<br />
to Animals (°)<br />
Bangor, Washington E-12<br />
Behavior<br />
Estimated<br />
Distance to<br />
Pile<br />
(m)<br />
Weather<br />
Conditions<br />
EHW 12-Oct-11 08:00 18:45 47 44.675 122 43.857 07:34 STSL 1 NA NA 75/183 RE 1,080 PC 1<br />
EHW 12-Oct-11 08:00 18:45 47 44.608 122 44.051 07:48 STSL 2 NA NA 75/106 RE 1,310 PC 1<br />
EHW 12-Oct-11 08:00 18:45 47 44.608 122 44.051 07:48 CASL 17 NA NA 75/106 RE 1,310 PC 1<br />
EHW 12-Oct-11 08:00 18:45 47 44.608 122 44.051 07:48 STSL 1 NA NA 75/106 MI 1,310 PC 1<br />
Beaufort<br />
Sea State<br />
Notes<br />
Hauled out on Vessel 1<br />
(north) at Delta pier, only<br />
right side of animal visible.<br />
"102Y' and one other large<br />
male hauled out on Vessel 2<br />
(middle) at Delta pier.<br />
Hauled out on Vessel 2<br />
(middle) at Delta pier.<br />
In water, joined with large<br />
male from Vessel 2, milling<br />
in water moving slowly<br />
towards fence, last sight<br />
07:58.<br />
EHW 12-Oct-11 08:00 18:45 47 44.550 122 44.074 08:07 CASL 7 NA NA 100/220 RE 1,410 PC 1 Hauled out on fence.<br />
EHW 12-Oct-11 08:00 18:45 47 44.542 122 44.210 09:10 CASL 14 NA NA 80/86 FL 1,450 PC 1<br />
EHW 12-Oct-11 08:00 18:45 47 44.542 122 44.210 09:10 STSL 1 NA NA 80/86 FL 1,450 PC 1<br />
EHW 12-Oct-11 08:00 18:45 47 45.214 122 43.441 09:14 HSEA 1 NA NA 75/315 SW,LO,SI 120 PC 1 STSL in water 09:09.<br />
EHW 12-Oct-11 08:00 18:45 47 45.214 122 43.441 09:18 HSEA 2 NA NA 10/052 SW,LO,DI 50 PC 1<br />
EHW 12-Oct-11 08:00 18:45 47 45.125 122 43.461 09:19 HSEA 1 NA NA 120/130 LO,RE,MI 350 PC 1<br />
EHW 12-Oct-11 08:00 18:45 47 44.542 122 44.210 09:20 STSL 1 NA NA 210/200 MI 1,800 PC 1<br />
2 animals moving south,<br />
9:23-9:37 HSEA in and out<br />
of EZ.<br />
0922, 0925, 0927 sighting.<br />
Last sighted 11:49<br />
STSL that was flushed off<br />
vessel milling outside fence,<br />
no direction of travel,<br />
perhaps SW, last sight was<br />
0920.<br />
EHW 12-Oct-11 08:00 18:45 47 45.125 122 43.466 09:29 HSEA 1 NA NA 200/150 LO,MI 450 PC 1 Joined Sighting 1<br />
EHW 12-Oct-11 08:00 18:45 47 45.125 122 43.466 09:41 HSEA 1 NA NA 250/135 LO,SI 350 PC 1 Joined Sighting 1 and 2<br />
EHW 12-Oct-11 08:00 18:45 47 45.069 122 44.187 09:44 HSEA 2 NA NA 80/010 SW,DI - OC 2<br />
EHW 12-Oct-11 08:00 18:45 47 45.214 122 43.441 09:54 CASL 1 NA NA 3/270 TR 50 PC 1<br />
EHW 12-Oct-11 08:00 18:45 47 44.556 122 44.159 10:34 HSEA 1 V Before 180/60 SW,DI 1,450 C 2<br />
SWIMMING GOING 300<br />
DEGREES<br />
CASL traveling fast to the<br />
north through EHW canal<br />
958 out of EZ<br />
heading south near Delta<br />
pier<br />
EHW 12-Oct-11 08:00 18:45 47 45.125 122 43.466 10:36 HSEA 1 V Before 200/135 SW 350 PC 1 Joined sighting 1, 2 and 3<br />
EHW 12-Oct-11 08:00 18:45 47 45.125 122 43.466 10:59 HSEA 1 SSV During 200/100 SW 400 PC 1<br />
Same seals/different<br />
activity. Swimming away<br />
from piling