Project Date<br />
NBK at Bangor EHW-1 Pile Replacement Project Final <strong>Marine</strong> Mammal Monitoring Report<br />
Time<br />
Observation<br />
Initiated:<br />
Time<br />
Observation<br />
Completed:<br />
EHW 7-Oct-11 07:25 18:18<br />
Latitude Longitude Sighting<br />
Time<br />
Species<br />
Number<br />
of<br />
Animals<br />
Construction<br />
Type<br />
Construction<br />
Monitoring<br />
(Before/ During/<br />
After)<br />
17:41 HSEA 1 V After<br />
Distance<br />
(m)/Direction<br />
to Animals (°)<br />
40/90° from<br />
hydrant<br />
Bangor, Washington E-8<br />
Behavior<br />
Estimated<br />
Distance to<br />
Pile<br />
(m)<br />
Weather<br />
Conditions<br />
SW,DI 75 S<br />
EHW 7-Oct-11 07:25 ? 47 45.141 122 43.415 17:43 HSEA 1 V After 75/310 LO 80 OC 0<br />
EHW 7-Oct-11 07:25 16:42 47 46.117 122 44.247 17:45 HPOR 2 V After 20/340<br />
SW(NNW),<br />
CH<br />
Beaufort<br />
Sea State<br />
1,950 OC 1<br />
EHW 7-Oct-11 07:25 16:42 47 46.117 122 44.247 17:52 CASL 1 V After 100/240 SW(N) 2,500 OC 1<br />
EHW 7-Oct-11 07:25 18:18 47 45.241 122 43.482 17:54 HSEA 1 V After 35/172 LO,SI 80 OC 1<br />
Notes<br />
Dove when vibratory turned<br />
on.<br />
Traveling north-northwest<br />
between vibe on-vibe off-<br />
Vibe on-vibe off; last<br />
sighted 17:50.<br />
Looking at barge activity<br />
then sank.<br />
EHW 7-Oct-11 07:25 18:18 47 45.252 122 43.500 18:08 HSEA 1 V After 300/270 SW(N),DI 380 PC 1 Heading north.<br />
EHW 7-Oct-11 07:25 16:42 47 44.439 122 44.506 18:16 CASL 29 V After 100/37 RE 1,800 OC 1<br />
EHW 8-Oct-11 08:05 17:00 47 45.156 122 43.419 08:12 HSEA 1 NA 100/285 LO,SI 100 F 0<br />
EHW 8-Oct-11 08:05 09:56<br />
08:16 HSEA 1 V Before<br />
30/135° from<br />
lightning tower<br />
SW (N), DI 82 S<br />
EHW 8-Oct-11 08:05 17:00 47 45.249 122 43.493 08:36 HSEA 2 V Before 60/190 MI 90 - 0<br />
EHW 8-Oct-11 08:05 17:00 47 45.156 122 43.419 08:42 HSEA 1 V Before 125/177 SW,LO,DI 225 - 0<br />
EHW 8-Oct-11 08:05 09:56<br />
8:45 HSEA 1 SSV During<br />
40/45° from<br />
lightning tower<br />
8 on package and 21 on<br />
WRA fence.<br />
Milling around stern of<br />
Scandia<br />
08:44 re-sight 125m from<br />
pile<br />
SW, DI 115 - 0 Same seal as before.<br />
EHW 8-Oct-11 08:05 17:00 47 45.156 122 43.419 08:49 HSEA 2 V During 300/280 LO,di 200 - 0 Swift resight their #1.<br />
EHW 8-Oct-11 08:05 17:00 47 45.230 122 43.482 08:53 HSEA 1 V After 120/330 SW (N),DI 90 PC 0 Heading north.<br />
EHW 8-Oct-11 08:05 17:00 47 45.243 122 43.488 08:57 HSEA 1 V After 120/258 SW (E),DI 200 PC 0 Heading west.<br />
EHW 8-Oct-11 08:05 17:00 47 45.156 122 43.419 09:00 HSEA 2 V After 25/002<br />
SW<br />
(SW),LO,SI<br />
75 PC 0<br />
Resight of animal obs by JR,<br />
headed south.<br />
EHW 8-Oct-11 08:05 17:00 47 45.238 122 43.503 09:02 HSEA 1 V During 300/255 SW (W) 380 PC 0 Heading west.<br />
EHW 8-Oct-11 08:05 17:00 47 45.380 122 43.127 09:05 HSEA 1 V During 40/315 LO 1,000 PC 0<br />
EHW 8-Oct-11 08:05 17:00 47 45.237 122 43.500 09:09 HSEA 1 V After 30/94<br />
EHW 8-Oct-11 08:05 17:00 47 45.237 122 43.490 09:13 HSEA 1 V During 140/330<br />
EHW 8-Oct-11 08:05 17:00 47 45.237 122 43.490 09:15 HSEA 1 V After 70/339<br />
EHW 8-Oct-11 08:05 09:56<br />
09:25 HSEA 1 V During<br />
0 from lightning<br />
tower<br />
SW<br />
(ENE),DI<br />
SW<br />
(NW),DI<br />
SW(E),LO,<br />
DI<br />
60 PC 0 Heading east-northeast.<br />
200 PC 0<br />
160 PC 0<br />
SW, DI 100 S<br />
Heading northwest, at 09:15<br />
approximately 70 m north,<br />
moving towards EHW1.<br />
At 09:35 in EHW1,<br />
approximately 85 m from<br />
pile, at 09:38 in EZ,<br />
approximately 46 m from<br />
pile.