Petaluma Bombing Target Archive Search Report ... - Corpsfuds.org
Petaluma Bombing Target Archive Search Report ... - Corpsfuds.org
Petaluma Bombing Target Archive Search Report ... - Corpsfuds.org
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
A. SITE DESCRIPTION AND PREVIOUS INVESTIGATIONS<br />
1. Site Description<br />
a. Size: 1770 acres<br />
b. Present Usage: (check all that apply)<br />
[ ] Milital)? [XI Recreational [ ] Other (specify)<br />
[ ] Residential [ ] Commercial<br />
[XI Natural Area [ ] Industrial<br />
[ 1 Agricultural [ ] Landfill<br />
[ ] Secured [ ] Active [ ] Unknown<br />
[XI Unsecured [ 1 Inactive<br />
2. Past Uses: 'fhe Navy used the former <strong>Petaluma</strong> 12th Naval District <strong>Target</strong> No.<br />
9 as a practice-bo~nbing and practice socket target from 1944-52.<br />
3. Surrounding Population (check all that apply)<br />
[XI Rural [ 1 Residential [ ] Other (specify)<br />
[ 1 Urban [ ] Industrial<br />
[ ] Cornrnescial<br />
4. Ordnance/li,xplosives (OE) Potential: practice bombs and practice rockets.<br />
B. DESCRIPTION OF ON-SITE ACTIVITIES (check all th(at apply)<br />
[XI Walk-through [ ] Drive-through [ ] Other (specify)<br />
[ ] On-Path [XI On-road<br />
[ ] Off-Path [ ] Off-road<br />
C. SITE PERSONNEL AND KESPONSIBlLITIES<br />
1. Responsibilities<br />
a. Project Manager: The Corps of Engineers Project Manager (PM) is<br />
overall responsible for thc site visit. He will assign a Team Leader, (in most<br />
situations this will be the PM). The PM will ensure that the SSHP is<br />
completed along with coordinating and executing the site visit.<br />
b. Site Safety and Health Officer: The SSHO is designated to conduct<br />
safety, enforce the SSIHP, conduct safety briefings and ensure that the team<br />
leader can safely fulfill his ob-jectives. The SSHO will maintain the safety gear