09.03.2013 Views

Letaba Biomass to Energy PDD - MyClimate

Letaba Biomass to Energy PDD - MyClimate

Letaba Biomass to Energy PDD - MyClimate

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROJECT DESIGN DOCUMENT FORM (GS-VER-<strong>PDD</strong>)<br />

Voluntary Offset Projects - Version 01<br />

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.<br />

page 19<br />

AMS II.D paragraph 4 stipulates that the project boundary is the physical, geographical site of the industrial or mining<br />

and mineral production facility, processes or equipment that are affected by the project activity. This will be the<br />

juicing plant at <strong>Letaba</strong> Estates, inclusive of the cooling room.<br />

B.5. Details of baseline information, including the date of completion of the baseline study and the name<br />

of person (s)/entity (ies) determining the baseline:<br />

Baseline compiled by Martin Kruse of BioTherm <strong>Energy</strong> (Pty) Ltd (martin.kruse@wspgroup.com tel +27 83 282 0846)<br />

and documented by Johan van den Berg of CDM Africa Climate Solutions (Pty) Ltd (johanvdb@cdmafrica.com tel<br />

+27 82 925 5680), reformulated for version 16 of the <strong>PDD</strong> on 26 June 2008 and retained in later versions.<br />

SECTION C. Duration of the project activity / Crediting period<br />

C.1 Duration of the project activity:<br />

C.1.1. Starting date of the project activity:<br />

1 Oc<strong>to</strong>ber 2009.<br />

C.1.2. Expected operational lifetime of the project activity:<br />

Operationally, the fuel switching will continue indefinitely and both the converted peel driers and the multifuel<br />

boilers are projected <strong>to</strong> last 15 years or more. The VAC will last 15 years or more.<br />

C.2 Choice of the crediting period and related information:<br />

C.2.1. Renewable crediting period<br />

Not applicable left open on purpose<br />

C.2.1.1. Starting date of the first crediting period:<br />

Not applicable left open on purpose<br />

C.2.1.2. Length of the first crediting period:<br />

Not applicable left open on purpose<br />

C.2.2. Fixed crediting period:<br />

C.2.2.1. Starting date:<br />

1 January 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!