Letaba Biomass to Energy PDD - MyClimate
Letaba Biomass to Energy PDD - MyClimate
Letaba Biomass to Energy PDD - MyClimate
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PROJECT DESIGN DOCUMENT FORM (GS-VER-<strong>PDD</strong>)<br />
Voluntary Offset Projects - Version 01<br />
Annex 5<br />
EIA Pre-screen<br />
1. Will there be a large change in environmental conditions?<br />
Only small changes; and such minor changes as described in annex 3 are in a positive way.<br />
2. Will new features be out-of-scale with the existing environment?<br />
No<br />
3. Will the effect be unusual in the area or particularly complex?<br />
Not applicable<br />
4. Will the effect extend over a large area?<br />
Not applicable<br />
5. Will there be any potential for transfrontier impact?<br />
No<br />
6. Will many people be affected?<br />
Few people, such as local workers and fishermen, will be affected, but only in a positive way.<br />
7. Will many recep<strong>to</strong>rs of other types (fauna and flora, businesses, facilities) be affected?<br />
No<br />
8. Will valuable or scarce features or resources be affected?<br />
No<br />
9. Is there a risk that environmental standards will be breached?<br />
No (confirmation of local authorities is available)<br />
10. Is there a risk that protected sites, areas, features will be affected?<br />
No<br />
11. Is there a high probability of the effect occurring?<br />
Not applicable<br />
12. Will the effect continue for a long time?<br />
This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.<br />
page 48