09.03.2013 Views

Letaba Biomass to Energy PDD - MyClimate

Letaba Biomass to Energy PDD - MyClimate

Letaba Biomass to Energy PDD - MyClimate

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROJECT DESIGN DOCUMENT FORM (GS-VER-<strong>PDD</strong>)<br />

Voluntary Offset Projects - Version 01<br />

Annex 5<br />

EIA Pre-screen<br />

1. Will there be a large change in environmental conditions?<br />

Only small changes; and such minor changes as described in annex 3 are in a positive way.<br />

2. Will new features be out-of-scale with the existing environment?<br />

No<br />

3. Will the effect be unusual in the area or particularly complex?<br />

Not applicable<br />

4. Will the effect extend over a large area?<br />

Not applicable<br />

5. Will there be any potential for transfrontier impact?<br />

No<br />

6. Will many people be affected?<br />

Few people, such as local workers and fishermen, will be affected, but only in a positive way.<br />

7. Will many recep<strong>to</strong>rs of other types (fauna and flora, businesses, facilities) be affected?<br />

No<br />

8. Will valuable or scarce features or resources be affected?<br />

No<br />

9. Is there a risk that environmental standards will be breached?<br />

No (confirmation of local authorities is available)<br />

10. Is there a risk that protected sites, areas, features will be affected?<br />

No<br />

11. Is there a high probability of the effect occurring?<br />

Not applicable<br />

12. Will the effect continue for a long time?<br />

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.<br />

page 48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!