Letaba Biomass to Energy PDD - MyClimate
Letaba Biomass to Energy PDD - MyClimate
Letaba Biomass to Energy PDD - MyClimate
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PROJECT DESIGN DOCUMENT FORM (GS-VER-<strong>PDD</strong>)<br />
Voluntary Offset Projects - Version 01<br />
much coal his<strong>to</strong>rically has been used for the boilers. The his<strong>to</strong>rical coal use is a function of the relative amount of<br />
citrus concentrate and single strength fruit juice made in a year and a calculation is made <strong>to</strong> determine the relative<br />
energy needs of the two types of output and <strong>to</strong> calculate an emissions fac<strong>to</strong>r for each.<br />
BASELINE DATA<br />
Carbon content coal and CV of coal at <strong>Letaba</strong> Estates<br />
This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.<br />
page 39<br />
His<strong>to</strong>rical<br />
ITEM QTY UNIT<br />
fruit juice<br />
and peel Coal CV as per lab results 27.00 Mjoule/<strong>to</strong>nne<br />
Carbon content coal (lab tests) 60 %<br />
production and coal use at <strong>Letaba</strong> Estates<br />
FRUIT TYPE<br />
TOTAL JUICE -<br />
2001 2002 2003 2004 2005<br />
Litre 10 927 196 10 387 835<br />
Dried peel<br />
11 269 302 17 183 685<br />
13 095 236<br />
produced – <strong>to</strong>nne<br />
Coal used – <strong>to</strong>tal<br />
for boilers and<br />
3 645 3 379 3 496 3 153 3 558<br />
peel driers 6 500 6 600 5 700 8 872 8 265<br />
Calculation of peel drier emissions fac<strong>to</strong>r<br />
Coal requirement = Amount of water that needs <strong>to</strong> be evaporated <strong>to</strong> achieve 1 <strong>to</strong>n of dried peels * gross<br />
heat requirement <strong>to</strong> evaporate 1 <strong>to</strong>n of water considering all losses / CV of Coal<br />
= 3.444 <strong>to</strong>nne * 4.722245 GJ/<strong>to</strong>nne/27<br />
= 0.602349 <strong>to</strong>nne of coal/<strong>to</strong>nne of peels dried<br />
CO2e emissions fac<strong>to</strong>r = coal requirement * a<strong>to</strong>mic weight of CO2/a<strong>to</strong>mic weight of carbon * carbon content of<br />
the coal<br />
= 0.602349 * 44.01 / 12.01 * 0.6<br />
= 1.324364 <strong>to</strong>nnes CO2e per <strong>to</strong>nne of peels dried<br />
Establishing how much coal his<strong>to</strong>rically has been used by the peel drier and boilers respectively<br />
The coal requirement in the peel drier is 0.602 <strong>to</strong>nnes per <strong>to</strong>nne of dried peels produced. When using the 0.602 and<br />
multiplying it by the average peel produced in the last five years, the following average coal use attributable <strong>to</strong> the<br />
peel drier and boilers respectively is found:<br />
2006<br />
16 465 571<br />
3 341<br />
7 560<br />
2007<br />
AVE-<br />
RAGE<br />
16 366 652 13 148 160<br />
3 991 3 509<br />
7 558 7 294