09.03.2013 Views

Letaba Biomass to Energy PDD - MyClimate

Letaba Biomass to Energy PDD - MyClimate

Letaba Biomass to Energy PDD - MyClimate

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PROJECT DESIGN DOCUMENT FORM (GS-VER-<strong>PDD</strong>)<br />

Voluntary Offset Projects - Version 01<br />

Principle 4: Establish a moni<strong>to</strong>ring system <strong>to</strong> ensure control over each CCP by scheduled testing or Observation;<br />

Principle 5: Establish a corrective action where moni<strong>to</strong>ring indicates that particular CCP is moving out of control;<br />

Principle 6: Establish validation and verification procedures and conduct a review <strong>to</strong> confirm that the HACCP system is working effectively;<br />

Principle 7: Establish documentation on the procedures and records appropriate <strong>to</strong> these seven principles and their application.<br />

The data <strong>to</strong> be moni<strong>to</strong>red as described above dictates how the first four principles of the HACCP system will be adhered <strong>to</strong>. There is an existing labora<strong>to</strong>ry at <strong>Letaba</strong> Estates<br />

and an existing weigh bridge that is presently used <strong>to</strong> measure inter alia how much fruit comes in<strong>to</strong> the juicing plant. These facilities will be used <strong>to</strong> establish and record how<br />

much biomass enters the premises. Should any coal be bought in it will also be recorded. The data will be captured on a log sheet hard copy and also electronically.<br />

The labora<strong>to</strong>ry at <strong>Letaba</strong> Estates has his<strong>to</strong>rically tested the carbon content of coal purchased and will continue <strong>to</strong> do so should auxiliary coal be needed. Principle 5 will be<br />

used in the unlikely event that a CCP moves out of control so that corrective action is taken speedily. Principles 6 and 7 of HACCP overlap with the requirements of the CDM<br />

and will not be duplicated.<br />

D.5 Name of person/entity determining the moni<strong>to</strong>ring methodology:<br />

Compiled by Johan van den Berg of CDM Africa Climate Solutions (Pty) Ltd (Tel +27 21 883 3474 or +27 82 925 5680). Assisted by Martin Kruse of BioTherm <strong>Energy</strong> (Pty)<br />

Ltd (Tel +27 83 282 0846)<br />

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.<br />

page 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!