09.03.2013 Views

Letaba Biomass to Energy PDD - MyClimate

Letaba Biomass to Energy PDD - MyClimate

Letaba Biomass to Energy PDD - MyClimate

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROJECT DESIGN DOCUMENT FORM (GS-VER-<strong>PDD</strong>)<br />

Voluntary Offset Projects - Version 01<br />

D. 2.2. OPTION 2: Direct moni<strong>to</strong>ring of emission reductions from the project activity (values should be consistent with those in section E).<br />

Not applicable<br />

Not applicable<br />

Phases 1-2<br />

Transport<br />

D.2.2.1. Data <strong>to</strong> be collected in order <strong>to</strong> moni<strong>to</strong>r emissions from the project activity, and how this data will be archived:<br />

D.2.2.2. Description of formulae used <strong>to</strong> calculate project emissions (for each gas, source, formulae/algorithm, emissions units of CO2 equ.):<br />

D.2.3. Treatment of leakage in the moni<strong>to</strong>ring plan<br />

Leakage is not considered for the reasons mentioned in section A.2 above.<br />

Shifts of pre-project activities and emissions from the production of renewable biomass<br />

Neither of these is applicable since the biomass is waste and these indica<strong>to</strong>rs are thus not moni<strong>to</strong>red.<br />

Competing uses of the <strong>Biomass</strong><br />

In order <strong>to</strong> show that there is a surplus of the biomass in the region of the project activity, which is not utilised, it will be demonstrated annually that the quantity of available<br />

biomass in the region (e.g. 50 km radius), is at least 25% larger than the quantity of biomass that is utilised including the project activity and, therefore, this source of leakage<br />

can be neglected. For this purpose the amount of available and utilised sawdust and woodchips in the region is determined by surveys.<br />

Phase 3<br />

Leakage is not considered as the energy efficiency technology is not equipment transferred from another activity.<br />

D.2.3.1. If applicable, please describe the data and information that will be collected in order <strong>to</strong> moni<strong>to</strong>r leakage effects of the project activity<br />

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.<br />

page 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!