SECTION E. Estimation of GHG emissions by sources<br />

E.1. Estimate of GHG emissions by sources:<br />

PROJECT DESIGN DOCUMENT FORM (GS-VER-<strong>PDD</strong>)<br />

Voluntary Offset Projects - Version 01<br />

Phases 1 & 2 Ecologically sound fuel switch <strong>to</strong> biomass with reduced energy requirement<br />

No formulae are needed once the fuel switches are complete as emissions by sources will be zero – fuel source<br />

(sawdust) is a CO2 neutral source of energy. The transport of biomass will cause a positive leakage and thus need<br />

not be considered. The emissions reduction will equal the baseline which will be determined as in Annex 2.<br />

Phase 3 AMS II.D <strong>Energy</strong> efficiency and fuel switching measures for industrial facilities<br />

This template shall not be altered. It shall be completed without modifying/adding headings or logo, format or font.<br />

page 31<br />

No additional formulae are needed. The project emissions will be zero as waste heat will be used <strong>to</strong> drive the cooling<br />

process.<br />

E.2. Estimated leakage:<br />

As expected above no leakage is expected<br />

E.3. The sum of E.1 and E.2 representing the project activity emissions:<br />

For the estimated period of a year after the project start date until Phase 3 is implemented there will be project<br />

emissions from Phase 3 equaling the baseline emissions for Phase 3 (5 125 <strong>to</strong>nnes), thereafter the project emissions<br />

will be zero. There will also be some Project emissions from phase 2 (5 116) as it is commissioned after phase 1.<br />

The <strong>to</strong>tal is 10 241.<br />

E.4. Estimated anthropogenic emissions by sources of greenhouse gases of the baseline:<br />

Phase 1 Ecologically sound fuel switch <strong>to</strong> biomass with reduced energy requirement (fuel switch boilers)<br />

Baseline emissions = Tonnes of peel dried in year y * emissions fac<strong>to</strong>r peel driers<br />

= 3509 * 1.324364<br />

= 4 647 <strong>to</strong>nnes per annum<br />

Phase 2 Ecologically sound fuel switch <strong>to</strong> biomass with reduced energy requirement<br />

Note: Because there is not really a “normal” year in terms of the division between single strength and citrus<br />

concentrate production, projections are done using aggregate average (his<strong>to</strong>rical) coal use in the boilers. Once the<br />

project activity has been implemented, the baseline will be calculated ex post by using the production figures and the<br />

emission fac<strong>to</strong>rs for the single strength juice and concentrate respectively<br />

Baseline emissions = Coal used in the baseline (as per annex 2) * emission fac<strong>to</strong>r boilers<br />

= 5 180 * 0.6*3.6<br />

= 11,189 <strong>to</strong>nnes/annum