ANNEXURE 2.3<br />

PRESSURE TESTING OF TRANSFORMER / REACTORS AT SITE<br />

1. After completion of oil filling, lock PRV and pressurise the air cell by<br />

filling nitrogen/ dry air to 5.0 p.s.i. (0.35 Kg/cm.sq.).<br />

2. Maintain above pressure for at least 12 hours.<br />

3. Inspect all joints for leakage, if any.<br />

4. Record pressure testing as given below.<br />

5. After pressure testing unlock PRV and release the nitrogen/ dry air<br />

pressure of air cell.<br />

NOTE: In case of conventional oil preservation system (without air cell)<br />

pressurise conservator by filling nitrogen/dry air in conservator .<br />

RECORD OF PRESSURE TESTING AT SITE<br />

DATE TIME<br />

1. Date & Time of testing (a) Started on ......... .........<br />

(b) Finished on ......... .........<br />

2. Initial pressure ....................................<br />

3. Pressure after 12 hours ....................................<br />

4. Leakages observed if any YES /NO<br />

location of leakages ....................................<br />

5. If leakages are observed. Same to be arrested and pressure testing<br />

is to be repeated.<br />

Prepared By Samvet Lahari, <strong>Bhopal</strong>. Phone- 5277412