25.03.2013 Views

instruction manual - BHEL Bhopal

instruction manual - BHEL Bhopal

instruction manual - BHEL Bhopal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.2.6 OFF CIRCUIT TAP SWITCH<br />

Tap switch handle should not be left halfway and/or unlocked.<br />

3.2.7 CONTINUITY TEST<br />

Continuity between line and neutral (for neutral end TC) or line to line<br />

(for line end TC) with multimeter on all taps and phases to be confirmed.<br />

3.2.8 MEASUREMENT OF WINDING RESISTANCE:<br />

Winding Tap No. Phase U Phase V Phase W Temp Remarks<br />

HV 1<br />

Winding 2<br />

IV<br />

Winding<br />

LV<br />

Winding<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9(a)<br />

9(b)<br />

9(c)<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

Prepared By Samvet Lahari, <strong>Bhopal</strong>. Phone- 5277412

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!