instruction manual - BHEL Bhopal
instruction manual - BHEL Bhopal
instruction manual - BHEL Bhopal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3.2.6 OFF CIRCUIT TAP SWITCH<br />
Tap switch handle should not be left halfway and/or unlocked.<br />
3.2.7 CONTINUITY TEST<br />
Continuity between line and neutral (for neutral end TC) or line to line<br />
(for line end TC) with multimeter on all taps and phases to be confirmed.<br />
3.2.8 MEASUREMENT OF WINDING RESISTANCE:<br />
Winding Tap No. Phase U Phase V Phase W Temp Remarks<br />
HV 1<br />
Winding 2<br />
IV<br />
Winding<br />
LV<br />
Winding<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9(a)<br />
9(b)<br />
9(c)<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17<br />
Prepared By Samvet Lahari, <strong>Bhopal</strong>. Phone- 5277412