26.03.2013 Views

Integrating Southwest Power Pool Wind to Southeast Electricity ...

Integrating Southwest Power Pool Wind to Southeast Electricity ...

Integrating Southwest Power Pool Wind to Southeast Electricity ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 5-13: Average Regulation up provision by unit type<br />

Figure 5-14: Average regulation up provision by region<br />

Figure 5-14 shows the regulation provision by region. While <strong>to</strong>tal Entergy generation was shown<br />

<strong>to</strong> remain approximately the same throughout the scenarios, it can be seen that it provides<br />

significantly more regulation from its CCs in 3 and 4 as they tend <strong>to</strong> be less expensive based on<br />

the inputs <strong>to</strong> this model. This means that the SBA and TVA units which provide reserve in<br />

Scenario 2, modeled as more expensive than the Entergy units, are turned down. SPP can be seen<br />

<strong>to</strong> carry far less regulation in Scenarios 2 and 3 versus Scenario 1, with some increase for<br />

Scenario 4.<br />

5-21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!