An Installation Pocket Reference Guide.pdf - Anixter
An Installation Pocket Reference Guide.pdf - Anixter
An Installation Pocket Reference Guide.pdf - Anixter
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5. Fiber Optic Cables|<br />
Step 14: Measure and mark an additional 11 mm on the<br />
fiber jacket.<br />
Step 15: Make sure the components are in the starting<br />
position. If not, slide the VFL coupler back toward<br />
the cover hinge until it locks. Verify the load button<br />
is released and the connector cradle is against the<br />
travel stop. Depress the reset button to return the<br />
wrench to the start position.<br />
anixter.com 61|