An Installation Pocket Reference Guide.pdf - Anixter
An Installation Pocket Reference Guide.pdf - Anixter
An Installation Pocket Reference Guide.pdf - Anixter
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5. Fiber Optic Cables|<br />
Step 22: Open the cover and slide the VFL coupler back into<br />
its starting position. Slightly squeeze the button to remove<br />
the connector.<br />
Make sure the clear ferrule dust cap is installed. Slide the<br />
boot up the back of the connector until it reaches the cam.<br />
Step 23: Install the outer shroud by lining up the date code<br />
with the key-side of the outer shroud. Using the boot, push<br />
the assembly into the outer shroud until it snaps into place.<br />
anixter.com 65|