No. 94-08-19 - City of Frisco
No. 94-08-19 - City of Frisco
No. 94-08-19 - City of Frisco
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2. Procedure for Replats<br />
1. Subdivider shall submit to the <strong>City</strong> <strong>of</strong> <strong>Frisco</strong> no later than three (3) weeks prior<br />
to the meeting <strong>of</strong> the Commission at which the Subdivider wishes their<br />
application to be considered:<br />
a. Filing Fee(s)<br />
b. Provide six (6) folded full size (24"x36") copies <strong>of</strong> the plat labeled "Reptat:.<br />
c. Provide twenty-four (24) folded copies (11" x 17") <strong>of</strong> the plat labeled<br />
"Replat".<br />
d. Provide thirty (30) copies <strong>of</strong> a completed application form including one (1)<br />
signed checklist.<br />
e. If the property to be replatted has been limited during the preceding five<br />
years , by either zoning classification or deed restriction, to residential units<br />
for not more than two residential units per lot, peel <strong>of</strong>f labels containing<br />
names and addresses <strong>of</strong> owners <strong>of</strong> all property in:<br />
a. the original subdivision, and<br />
b. within 200' <strong>of</strong> lot(s) being replatted<br />
f. Provide a tax status form.<br />
g. Provide supplementary materials as applicable in other sections <strong>of</strong> these<br />
regulations.<br />
h. Submit to the <strong>City</strong> <strong>of</strong> <strong>Frisco</strong> no later than three (3) weeks prior to the<br />
Commission meeting at which it is to be considered: five (5) sets <strong>of</strong><br />
detailed construction plans prepared by a Registered Pr<strong>of</strong>essional Engineer<br />
showing details <strong>of</strong> streets, alleys, culverts, bridges, storm sewers, water<br />
mains, sanitary sewers and other engineering details.<br />
2. <strong>City</strong> Staff shall:<br />
a. Make a study <strong>of</strong> the plats, engineering plans, and reports, and submit<br />
plans to the <strong>City</strong> Engineer for written recommendation.<br />
b. Request written reports from departments and utilities if deemed<br />
necessary.<br />
c. Make available replats and reports to Planning and Zoning Commission and<br />
the applicant for review.<br />
d. Consult with <strong>City</strong> Staff and Engineer, Subdivider's Engineer, Telephone<br />
Company, Gas Company, Electric Company, Cable T.V., School District, as<br />
necessary.<br />
e. Schedule application for consideration upon agenda <strong>of</strong> the Planning and<br />
Zoning Commission.<br />
3. Planning and Zoning Commission shall:<br />
a. Hold a Public Hearing.<br />
b. Act within thirty (30) days after the fili ng <strong>of</strong> the replat unless the applicant<br />
agrees to waive their right to approval within thirty (30) days <strong>of</strong> the fining<br />
date.<br />
4-6